Laserfiche WebLink
A.EXACT LOCATION OF PLUMBING FIXTURES SHALL BE <br />DETERMINED FROM ARCHITECTURAL DRAWINGS. <br />B.BEFORE SUBMITTING BID, THE PLUMBING CONTRACTOR <br />SHALL REVIEW THE ARCHITECTURAL DRAWINGS AND <br />INCLUDE IN HIS BID AN AMOUNT TO FURNISH AND INSTALL <br />ANY FIXTURES WHICH ARE SHOWN IN ADDITION TO FIXTURES <br />SHOWN ON THE PLUMBING DRAWINGS. <br />C.CONTRACTOR SHALL VERIFY INVERT ELEVATIONS OF <br />SEWERS TO WHICH NEW WASTE LINES ARE TO BE <br />CONNECTED BEFORE MAKING UP OR INSTALLATION OF NEW <br />WASTE SYSTEM. <br />D.CONTRACTOR SHALL VERIFY AND COORDINATE LOCATION OF <br />ALL PLUMBING LINES WITH DUCTWORK AND ELECTRICAL <br />SERVICES. <br />E.THE INSTALLATION OF ALL VALVES, UNIONS, <br />THERMOMETERS, GAUGES, OR OTHER INDICATING OR <br />RECORDING EQUIPMENT, OR SPECIALTIES REQUIRING <br />FREQUENT READING, REPAIRS, ADJUSTMENT, INSPECTION, <br />REMOVAL OR REPLACEMENT SHALL BE CONVENIENTLY AND <br />ACCESSIBLY LOCATED WITH REFERENCE TO THE FINISHED <br />BUILDING. <br />F.ALL VENTS THROUGH ROOF SHALL BE 10'-0" REMOVED FROM <br />ALL AIR INTAKES, EVAPORATIVE COOLERS, ETC. <br />G.WHERE POSSIBLE, TIE VENTS TOGETHER SO THAT A MINIMUM <br />NUMBER TERMINATE THROUGH THE ROOF. <br />H.CONTRACTOR SHALL NOT CUT HOLES IN STRUCTURAL <br />MEMBERS WITHOUT FIRST SECURING WRITTEN APPROVAL <br />FROM THE ARCHITECT. <br />I.CONTRACTOR SHALL INSTALL DIELECTRIC UNIONS AT <br />CONNECTIONS OF DISSIMILAR METALS. <br />J.CONTRACTOR SHALL ROUGH-IN ALL WASTES AND SUPPLIES <br />TO SPECIAL EQUIPMENT ACCORDING TO MANUFACTURERS <br />SHOP DRAWINGS AND MAKE FINAL CONNECTIONS. ALL <br />SUPPLIES SHALL BE VALVED. <br />K.ALL PLUMBING INSTALLATIONS SHALL COMPLY WITH THE <br />UNIFORM PLUMBING CODE, NFPA 90, AND ALL LOCAL, STATE, <br />AND FEDERAL ORDINANCES, CODES, LAWS AND <br />REGULATIONS. <br />L.ROUTE V LINES IN CEILING AS HIGH AS POSSIBLE. <br />M.CONTRACTOR TO COORDINATE WITH KITCHEN EQUIPMENT <br />DRAWINGS FOR LOCATIONS AND REQUIREMENTS OF <br />COOKING EQUIPMENT. <br />N.PROVIDE PROPER VENTING ON PLUMBING FIXTURES FOR <br />TRAP ARM LENGTH NOT TO EXCEED THE LENGTH GIVEN IN <br />TABLE 1002.2 OF THE CPC FOR SIZE OF PIPE SHOWN. <br />1.ROUTE NEW WASTE PIPING 5' OUTSIDE BUILDING WITH 2-WAY <br />CLEANOUT. SLOPE PIPING 1/8" PER FOOT. CONNECT NEW <br />WASTE LINE TO STUB-OUT ON SITE. WASTE PIPING 48" BFF <br />INVERT AT 2-WAY CLEANOUT. CONTRACTOR TO FIELD VERIFY <br />EXACT SIZE, DIRECTION OF FLOW, INVERT AND LOCATION <br />PRIOR TO CONNECTION. <br />2.PROVIDE AND INSTALL FLOOR SINK FLUSHED WITH FINISHED <br />FLOOR. <br />KEYED NOTES <br />GENERAL NOTES <br />P2.2 <br />PLUMBING PLAN - <br />WASTE & VENT <br />--www.stantec.comTEL. 1383 North McDowell Blvd. Suite 250Petaluma, CA 94954707.765.1660Architecture Inc.R <br />ENGINEERING, INC <br />OBISON <br />19401 40TH AVE W., SUITE 302 <br />LYNNWOOD, WA 98036 <br />206-364-3343 tel <br />CONTACT: MARK MANGLICMOT <br />5/14/21 <br />- <br />1 PLUMBING PLAN - WASTE & VENT SCALE: 1/4" = 1'-0"