Laserfiche WebLink
1/2"5'-4"ECOLAB DISPENSER <br />ECOLAB HOSE AND HOSE RACK <br />HATCH DENOTES <br />BLOCKING. <br />CC <br />EZ <br />SS <br />SS <br />ECOLAB CLICK & CLEAN <br />LOCATIONS: 3-COMP SINKS. <br />RE:MIXING VALVE NOTE. <br />CC <br />COPPER 'T' WITH 3/4" MALE GHT <br />AT EACH OPENING <br />COPPER 'T' CONNECTION FOR RPZ <br />ECOLAB SANI-SAVE <br />LOCATIONS: JANITOR CLOSET <br />ABOVE MOP SINKS. <br />RE: MIXING VALVE NOTE. <br />HOLES, GROMMETS AND CAPS BY <br />SINK MFR TO ALLOW RIGHT OR LEFT <br />HAND INSTALLATION BASED ON PREP <br />AREA LAYOUT <br />ECOLAB EASY SWITCH FOAM(LmENTARY) <br />EZ1 = HOT WATER ONLY.2"WATTS LF008PCQT BACKFLOW <br />PREVENTER, MOUNT AT MFR <br />REQUIRED HEIGHT ABOVE <br />DISPENSER CONNECTION. <br />BACKFLOW SHOWN REQUIRES <br />6'' MINIMUM. <br />COPPER STUB WITH 3/4" MALE GHT <br />UNIONS <br />SHUT OFF VALVES, SINK WITH <br />SPRAYERS TO HAVE CHECK VALVES <br />ON HOT AND COLD LINES <br />FLOOR LINE <br />C.O. PLUG <br />PROVIDE RPZ AND MIXING VALVE <br />DISPENSER GENERAL NOTES: <br />A.DISPENSERS CANNOT BE ABOVE SANITIZING <br />SINK BOWLS OR CLEAN DRAIN BOARDS. <br />B.WATER SUPPLY FOR DISPENSERS (AT RPZ) <br />REQUIRES A 3/4" MALE GHT FOR ECOLAB <br />SUPPLIED HOSE. <br />C.MIXING VALVE SETPOINTS: <br />C.A.CLICK & CLEAN (ONLY), OR CLICK & CLEAN <br />+ SANI-SAVE, SET TO 110°F <br />ECOLAB WALLMOUNT BAG RACKS <br />OVERHEAD WATER <br />SUPPLY, RE: P2.1 <br />OVERHEAD HOT AND COLD <br />WATER SUPPLY, RE: P2.1 <br />'CC' FLOOR CADDY, 2 BAGS <br />'SS' FLOOR CADDY, 2 BAGS <br />CONFIRM LOCATION WITH <br />OWNER PRIOR TO BID AND <br />INSTALLATION. <br />INSULATED POTABLE WATER SUPPLY PIPING. <br />PIPES SHALL BE SECURED TO WALL WITH PIPE <br />CLAMPS PROVIDING CLEARANCE TO MEET <br />HEALTH DEPARTMENT REQUIREMENTS. <br />FLOOR SINK <br />SANITARY <br />DRAIN LINE RE: DRAWINGS FOR FINAL PLUMBING <br />CONNECTION REQUIRED BY <br />AUTHORITY HAVING JURISDICTION. <br />THREADED <br />CONNECTIONS <br />ALL SINKS EQUIPPED WITH SPRAYERS SHALL <br />HAVE CHECK VALVES ON BOTH HOT & COLD <br />WATER LINES UNDER THE SINKS SUPPLYING <br />THE FAUCETS.SPRAY <br />ATTACHMENT SWING FAUCET <br />SPRAYER BRACKET MUST BE ATTACHED TO WOOD <br />BLOCKING. PROVIDE PLYWOOD BACKING (AT <br />COOLER PANEL) OR SOLID BLOCKING (AT STUD <br />PARTITIONS). <br />AIR GAP <br />DISH CLEANING & SANITIZING - ECOLAB <br />N.T.S.11 <br />DRAIN & FLOOR CLEANER - ECOLAB <br />N.T.S.10 <br />NOTE: INSTALL RPZ UNDER <br />SINK AND TEE OFF WATER <br />SUPPLY COMING DOWN WALL. <br />DO NOT INSTALL ABOVE SINK. <br />RTU CONDENSATE DRAIN <br />N.T.S.1REDUCED PRESSURE BACKFLOW ASSEMBLY <br />N.T.S.4GAS WATER HEATER DETAIL <br />N.T.S.7 <br />REFRIGERATED CASE DRAIN <br />N.T.S.2RTU GAS CONNECTION <br />N.T.S.5WATER FILTER SCHEMATIC <br />N.T.S.8 <br />FLOOR CLEANOUT (FCO) DETAIL <br />N.T.S.3TWO-WAY GRADE CLEANOUT (GCO) DETAIL <br />N.T.S.6WALL CLEANOUT (WCO) DETAIL <br />N.T.S.9 <br />SS ECOLAB SANI-SAVE <br />LOCATIONS: JANITOR CLOSET <br />ABOVE MOP SINKS. <br />RE: MIXING VALVE NOTE. <br />ROOM'S INSIDE CORNERDISPENSER GENERAL NOTES: <br />A.DISPENSERS CANNOT BE ABOVE SANITIZING <br />SINK BOWLS OR CLEAN DRAIN BOARDS. <br />B.WATER SUPPLY FOR DISPENSERS (AT RPZ) <br />REQUIRES A 3/4" MALE GHT FOR ECOLAB <br />SUPPLIED HOSE. <br />C.MIXING VALVE SETPOINTS: <br />C.A.SANI-SAVE (ONLY), SET TO 75°F <br />MIXING VALVE <br />PLUMBING CONTRACTOR SHALL PROVIDE AND <br />INSTALL GAS WATER INTAKE AND VENTING PIPING <br />AND TERMINATION ASSEMBLIES PER <br />MANUFACTURER'S RECOMMENDATION. PROVIDE <br />CONCENTRIC VENT KIT. <br />P4.0 <br />PLUMBING DETAILS <br />--www.stantec.comTEL. 1383 North McDowell Blvd. Suite 250Petaluma, CA 94954707.765.1660Architecture Inc.R <br />ENGINEERING, INC <br />OBISON <br />19401 40TH AVE W., SUITE 302 <br />LYNNWOOD, WA 98036 <br />206-364-3343 tel <br />CONTACT: MARK MANGLICMOT <br />5/14/21 <br />-