Laserfiche WebLink
n <br />n <br />Date <br />Total Dally <br />Tonnage <br />-2013- <br />September:1, <br />220.00 <br />0.00 22 <br />;September `42-20f8-,- <br />2583.98 <br />2225.49 195 <br />--:September 3,-2013. <br />3221.12 <br />2572.07 307 <br />September=4, 2013 '' <br />3315.94 <br />2885.40 255 <br />Septem6Wr 201 <br />3317.24 <br />2772.81 256 <br />September;6, 2013x_ <br />3694.24 <br />3209.94 293 <br />Septeirmber Y7, 201=3 = <br />1247.86 <br />1047.86 101 <br />- September 8; 2013 " <br />200.00 <br />0.00 20 <br />Septeinber.9 2013 `: <br />3477.83 <br />3089.45 270 <br />Septenberr1'0,_2013 <br />4043.02 <br />2889.47 292 <br />September 11, 2013 ' <br />3724.94 <br />3104.51 273 <br />:September 1`2, 2ft <br />3532.07 <br />3009.32 278 <br />September 1;.3, .2013: <br />3386.472997.53 <br />261 <br />='September 14, 201Y`3 ` <br />1192.05 <br />985.24 98 <br />September 15;= 2®13 <br />210.00 <br />0 21 <br />September 16,. 2013-' <br />3582.62 <br />3090.01 276 <br />:September.,,1. ,.20, <br />3126.62 <br />2637.53 256 <br />epter e- -1=8,; 201,3: <br />3165.82 <br />2711.87 249 <br />Seo termber;:19;:2®13 ` <br />3067.56 <br />2604.94 266 <br />Septe`mbe620.201'3 <br />3053.74 <br />2715.9 270 <br />September -21,:2013' <br />678.21 <br />530.31 63 <br />"September 22,-2013 <br />150.00 <br />20 15 <br />September23,2013 ` <br />3467.02 <br />3157.63 255 <br />,September 24, 2013 ' <br />3994.16 <br />3077.5 292 <br />Sepfember;25,2013. <br />3491.17 <br />2721.32 270 <br />September 26, 201.3 <br />3274.91 <br />2906.14 251 <br />-September 27, 2013 <br />2728.74 <br />2517.67 223 <br />:Septermber4-2 8, 201"3_ <br />577.40 <br />487.4 54 <br />Septembery29, 201`3 <br />90.00 <br />0 9 <br />Septernber 30,, 201=3 ' <br />3277.50 <br />3002.78 258 <br />Total Tons Received <br />75092.23 <br />(Equals Total Tons Landfilled - 0 Tons of Stockpile Material cleared for use as cover) <br />Total Disposed Waste <br />62970.09 <br />Avg Daily Truck Count 229 <br />