My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 9:42:05 AM
Creation date
1/10/2023 9:05:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC. #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 SO-tOOUCT PROCEDURE SELOW, <br /> FOR 71 WTOOL,SEE PAGE$ 71 S 0-TOOUCT <br /> j FOR 7150-TOOLC,SEDC PAGE 9 _ <br /> l STEP 4C: INSERT 71SO-TOOi CT OVER SET TUBE <br /> To in"[the 71 547WLCT(sold sepdraaety)ovger the <br /> -nler tube,fit loosen ttte thumb sr-rews,so the tool ran <br /> pass freely over the Inlet tube flange. Aligri the slot on <br /> the tool with the heir on the In let tube and insert the <br /> tool down. SM Figure 9C. TIp to stop dimension must <br /> be 1-3/16'to I-114- <br /> Loosen F,jgirts 7 it G <br /> thumb hand tighten STEP 12C: DlULL HOLES <br /> screws Tool 5101 thumb straws With the inlet tube and 71 S&TOOLCT in place,carefully <br /> ddH a 3/16'diameter hole In the upper tube using the <br /> hole in the 71 SO-TOOtiCT as a g wide_ The ori H stop is <br /> pasitiat ed SU it W%bottom 0111 against the toot after <br /> n.E'_ �'`j' .. .� f1 i thp bit has drilled through the upper drop tube. If the <br /> stop is posidoned wrong either no hole wil be dnik-, <br /> 0r a through hole could patenf3alty be dr1led through <br /> the inlet tube. If no hole is d ri lted return to step I I C <br /> "-N and check the stop dimension. If a mole is drilled <br /> rrr I' through The inlet tube o r'into dte screw hole the assem- <br /> bly is not salvageable. Drill(2)mare holes in the two <br /> Inlet remaining guide holes. <br /> i <br /> Tube I <br /> . Key <br /> figure 9+C Ferre i OC <br /> STEP l OC: TDGIi M THE 7150-TOOLCT <br /> Ensure that the too)se,=flat against the tap of the inlet <br /> tube. Toprevent verikalmovement ofthe tool durinq <br /> drilling,hand tighten 0*thumb screws against the up- <br /> per drop tube. See figure l X <br /> STEP i iC: PREPARE DRILL AMO MY <br /> Confirm that the stop on the 311 a drill bit supplied Figure i?C <br /> w4ththe,7lS0-T0pLLz is in theconwt position befDre <br /> drilting. The stop Isfactory installed at a distance be-- <br /> tween 13/16"to 1-1/4"horn the tip with the 71 SO- <br /> 70OLCT. If the stop is not at tike correct position n must <br /> be fixed before drilling. <br /> CAU'T10N,*the drUl stop is not in tfm proper loco. <br /> tia n failure oaf a pr+essure decay leak text may resuk, <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.