CLIENT: <br /> CAM-N. TANK EXCAVA110N NOTE: GROUNDWATER LCL NOTE- bp <br /> POTENTIAL UTILITY CONFLICT. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING AND TANK EXCAVATIONS SHALL BE PER OSHA REQUIREMENTS AND BE PERFORMED <br /> NEW UTILITIES PRIOR TO CONSTRUCTION. SEE UTILITY CONFLICT NOTE THE EXISTING FOLLOWING THE RECOMMENDATIONS OF THE SOILS REPORT. TANKS A SOILS REPORT OF THIS SITE LOCATION HAS REVEALED THAT GROUNDWATER <br /> WATER, STORM, AND SANITARY SEWER SERVICE SHOWN IS APPROXIMATE, BASED ON EXCAVATIONS THAT REQUIRE SHORING SHALL BE ENGINEERED AND PERMITTED WAS NOT ENCOUNTERED BELOW THE GROUND SURFACE WITH A MAXIMUM <br /> FIELD SURVEYS AND "AS-BUILT" RECORDS. THE GENERAL CONTRACTOR SHAD_ SEPARATELY AND SHALL BE THE RESPONSIBILITY OF THE INSTALLING EXPLORED DEPTH OF 50.5 FEET. TANKS SHALL BE INSTALLED WITH <br /> "POTHOLE" THE EXISTING UTILITIES TO VERIFY THE DIAMETER AND LOCATION INCL <br /> { CONTRACTOR. HIGH WATER TABLE IS ANTICIPATED. CONTRACTOR TO SHORE CONCRETE DEADMEN AND FILTER FABRIC PER MANUFACTURERS' GUIDELINES. <br /> ELEVATIONS) PRIOR TO CONSTRUCTION. ANY DISCREPANCIES IN THE LOCATION OF AND DEWATER TANK HOLE EXCAVATION. FOLLOW TANK MANUFACTURER'S <br /> THE EXISTING PIPE OR INCOMPATIBILITY OF THE DESIGN SHALL BE BROUGHT TO THE INSTALLATION INSTRUCTIONS FOR WET HOLE TANK INSTALLATION. <br /> IMMEDIATE ATTENTION OF THE OWNERS REPRESENTATIVE, AND OWNERS CIVIL <br /> ENGINEER. <br /> SOILS REPORT BY: <br /> OLU COMCINOTE: <br /> SALEM ENGINEERING GROUP, INC. <br /> CAROM: 4729 W. JACQUELYN AVENUE FRESNO, CA 93722 <br /> THE CONTRACTOR SHALL BPHONE (599) 271-9700E RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, �' � JOSUE A. MONTES, PE, GE <br /> AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT �Op YAG Free REPORT FILE 4-215-1064 E, GE <br /> BY POT HOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL Q�� m o] Free �0 DECEMBER E 2415 <br /> LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE <br /> 1 (800) 227-2600 AND THEN POT HOLING ALL OF THE EXISTING UTILITIES AT 7, <br /> LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT tIMMS DAYS <br /> CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE IREFONE Y <br /> OU <br /> BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. <br /> IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT THE OWNERS CIVIL <br /> ENGINEER TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. lor <br /> QENERAL NOTES <br /> PIPING LEGEND ARCO <br /> FIBERGLASS PRODUCT PIPING <br /> FIBERGLASS VAPOR RECOVERY PIPING E?lzm COAN Fxom LLC <br /> - - - - _ FIBERGLASS VENT PIPING <br /> NOTE: <br /> CONTRACTOR ASSUMES RESPONSIBILITY TO ASSURE THAT THE OPERABLE SYSTEM MEETS THE DESIGN INTENT AND THE CONTRACTOR <br /> IS PERMITTED TO ADJUST PIPING LOCATIONS BASED ON ACTUAL FIELD CONDITIONS AND INSTALLATION TECHNIQUES. <br /> PRODUCT, VAPOR AND VENT PIPING IS TO SLOPE TOWARD TANK 1/8" PER FOOT MINIMUM, 1/4" PER FOOT PREFERRED. IF <br /> -`-- INSTALLED, SIPHON PIPING TO SLOPE 1/4" PER FOOT. <br /> - - ------------------- <br /> " SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY, NOT GRAPHICALLY. ALL PRODUCT PIPING TO BE DOUBLE CONTAINMENT <br /> to <br /> PIPE. VENT AND VAPOR RECOVERY SHALL BE SINGLE WALL, UNLESS REQUIRED BY LOCAL JURISDICTION. Rl t . <br /> t i <br /> 47 <br /> _-------- -----__ ----------_-�__�_------------ -------------------------- ----_------ �� / �,i <br /> � INSTALL DOUBLE WALL FIBERGLASS TANKS WITH CONTINUOUS MONITORING OF HYDROSTATIC ANNULAR SPACES BY "VEEDER ROOT" TLS-350 TANK AND *� � <br /> - _ _ ; PIPING MONITOR AND ALARM SYSTEM. ALL TANK. SUMPS SHALL BE INDIVIDUALLY CONTINUOUSLY MONITORED BY "VEEDER ROOT" LIQUID SENSORS TIED 0 � <br /> INTO THE TLS-3508 TANK & PIPING MONITOR SYSTEM. TANKS TO BE SET MIN. 60" BELOW FINISH GRADE. TANK INSTALLATION SHALL BE IN c <br /> d i , ACCORDANCE NTH MANUFACTURER'S INSTALLATION INSTRUCTIONS. <br /> INSTALL A CONCRETE SLAB OVER TANKS. SURFACE WATER SHALL BE DIVERTED AWAY FROM EACH MANHOLE BY FORMING A CONCRETE CROWN WITH A <br /> O tea. 1-1/2" DROP IN 18" FROM THE EDGE OF THE MANHOLE RING TO THE SURROUNDING SLAB ELEVATION. CONSTRUCT SLAB PER CIVIL SLAB INSTALLATION <br /> DETAILS AND SPECIAL REQUIREMENTS SHOWN ON DETAILS. �9� � �0 <br /> d ° PEW GSPHALT ® INSTALL 4" EVR PHASE I APPROVED DUAL POINT FILL ADAPTERS AND CAPS. INSTALL ALUMINUM FILL DROP TUBES. <br /> PAVING, TYP. <br /> Q INSTALL 4" EVR PHASE I APPROVED DUAL POINT STAGE I VAPOR RECOVERY ADAPTERS AND CAPS. 18215 72ND AVENUE SOUTH <br /> ®INSTALL ONE (1) 2 HP VARIABLE SPEED TURBINES IN THE 20,000 GALLON REGULAR UNLEADED TANK (TANK #1). KENT, WA 98032 <br /> INSTALL ONE (1) 2 HP VARIABLE SPEED TURBINE IN THE 12,000 GALLON UNLEADED PREMIUM TANK COMPARTMENT (TANK #2). 1;425)251-6222 <br /> i. TURBINE SYSTEMS TO BE EQUIPPED WITH 3 GPH ELECTRONIC LINE LEAK DETECTION. LEAK DETECTORS ARE TO BE TESTED FOR THE 3 GPH LEAK <br /> I DETECTION PRIOR TO START UP. CONTRACTOR TO PROVIDE TEST DATA AT THE TIME OF PUNCH LIST AS WELL AS INCLUDE IN CLOSE OUT BINDER. SET (425)251-8782 FAX <br /> TURBINE INTAKES AT 5" FROM BOTTOM OF TANKS. TURBINES TO BE EQUIPPED WITH INTAKE FILTER SCREENS. CONTRACTOR IS TO LABEL TURBINES <br /> I AND CONTROLLERS AS TO WHICH PRODUCT THEY SERVE. GREEN CONTROLLER LIGHTS ARE TO GO OUT WHEN TURBINES ARE OFF OR LOSE POWER. <br /> CIVIL ENGINEERING, LAND PLANNING, <br /> ISLAND BUMPER POST 17 (IYP. 6 SINGLE HOSE SURVEYING, ENVIRONMENTAL SERVICES <br /> (TYP. 8 PLCS.) PER SIDE BLENDING ____-` © IF REQUIRED BY LOCAL AUTHORITY HAVING JURISDICTION INSTALL 3" FIBERGLASS STAGE 11 VAPOR RECOVERY HEADER FOR VAPOR RECOVERY SYSTEM. <br /> 3L0 PRODUCT MPD} SLOPE 1/8" PER FOOT MINIMUM TO TANKS. INSTALL 3" TO 2" REDUCING TEES WHERE HEADERS BRANCH TO DISPENSERS. CONTRACTOR TO INSTALL <br /> TRACER TAPE WITH VAPOR PIPING. TESTING OF VAPOR LINES SHALL BE PERFORMED PRIOR TO BACKFILL, PRIOR TO PAVING AND BEFORE STATION NO. DATE REVISION DESCRIPTION <br /> ---. - OPERATION. SECONDARY CONTAINMENT TO BE INSTALLED WHEN REQUIRED BY LOCAL JURISDICTION ONLY. SEE DETAILS AND SCOPE OF WORK ON SHEETS <br /> 2Fl INSIDE <br /> SS 7 I' dQ i 0.0.2.1 & G.0.2.2 FOR PIPE SIZING AT UNDERGROUND STORAGE TANKS. 1 <br /> PRODUCT PIPING 19 } ° d 4° a °° �. a I O INSTALL 2" INSIDE 3" DOUBLE WALL FIBERGLASS GASOLINE SUPPLY LINES TO DISPENSERS. PIPING SHALL BE INSTALLED PER MANUFACTURER'S 2 <br /> SPECIFICATIONS AND INSTRUCTIONS. PIPING SHALL BE INSTALLED WITH A MINIMUM SLOPE OF 1/8" PER FOOT FROM THE FURTHEST DISPENSER SUMP DOWN <br /> TO THE TURBINE SUMPS. CONTRACTOR TO INSTALL TRACER TAPE WITH PRODUCT PIPING. TESTING OF PRODUCT LINES SHALL BE PERFORMED PRIOR TO 3 <br /> ° 7 2" I SIDE 3" BACKFILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. <br /> ° I FIB GLASS <br /> 2" STAGE II 6 ( ° �l a 44 I� i 19 PR DUCT PIPING ® INSTALL "VEEDER ROOT" TANK AND LINE ALARM CONTROL PANEL MODEL # TLS-350R IN BUILDING AT NORMALLY OCCUPIED LOCATION IN BUILDING. SEE 4 <br /> VAPOR I d I 6 2° AGE II ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR EXACT LOCATION. 5 <br /> 19 <br /> -��- I 19 VA OR ® INSTALL A SINGLE 2" FRP VENT LINE FOR EACH UNDERGROUND STORAGE TANK. SLOPE 1/4" PER FOOT (1/8" PER FOOT MINIMUM) TO TANKS AS SHOWN. Q <br /> �/' CONTRACTOR TO INSTALL TRACER TAPE WITH VENT PIPING. SECONDARY CONTAINMENT TO BE INSTALLED WHEN REQUIRED BY LOCAL JURISDICTION ONLY <br /> TERMINATION POINT OF TANK VENTS TO BE A MINIMUM OF 12' ABOVE GRADE AND NOT WITHIN 5' FROM ANY BUILDING OPENING OR PROPERTY LINE <br /> THAT CAN BE BUILT UPON. VENT RISERS SHALL BE INSTALLED IN ACCORDANCE WITH UNIFORM FIRE CODE REQUIREMENTS. INSTALL TWO (2) SPARE O <br /> CL 1" CONDUITS W/ PULL ROPE FROM GASOLINE VENT RISER TO BUILDING FOR FUTURE TANK DIAGNOSTIC REQUIREMENTS. VERIFY LOCAL REGULATIONS <br /> ° G 44 <br /> + FOR ADDITIONAL EQUIPMENT OR INSTALLATION REQUIREMENTS. <br /> I •a 9 ° d 4 j 11 INSTALL A SINGLE 1" RIGID GALVANIZED CONDUIT FOR EACH NEWLY INSTALLED TURBINE PUMP. O <br /> • 1 12 INSTALL DUAL FLOAT TANK ANNULAR SPACE HYDROSTATIC MONITORING SENSORS. SEE DETAILS FOR CONDUIT LOOPING BETWEEN ANNULAR RISER <br /> *� 3" STAGE 11 6 ( d°' d- a a•a + ) ' AND SUMPS. 19 <br /> \ `•� /,£ DOUBLE WALL FIBERGLASS 1 VAPOR 19 "° 4'' a <br /> UNDERGROUND STORAGE TANKS INSTALL BALL FLOAT/VALVE EXTRACTOR ASSEMBLIES FOR VENT, STAGE I AND STAGE 11 VAPOR RECOVERY AT FILL SIDE SUMP. VERIFY WITH LOCAL <br /> d . ° ° 1 JURISDICTION FOR ALTERNATE REQUIRED LOCATIONS. SEAL <br /> FILL 15 3 I- -° -°-'- ' =.-�- t q�"I� <br /> \ i 14 INSTALL .1 GPH MAG PROBE TANK LEVEL GAUGES AT FILL SUMPS AS SHOWN. QR�FESS� <br /> TANK LEVEL GAUGE 14 18 <br /> 4. 15 TANKS SHALL BE PROPERLY MARKED AND TAGGED WITH STANDARD API IDENTIFICATION MARKINGS AT FILL MANHOLES. � <br /> " PER FT. <br /> NlIN, + ` 16 INSTALL 3" INSIDE 4" DOUBLE WALL FRP ACTIVE SIPHON BETWEEN 87 OCTANE TANKS AS SHOWN. SLOPE 1/4" PER FOOT UP TO PRIMARY TANK <br /> \ - _ - = 1 VERIFY LOCAL REGULATORY REQUIREMENTS FOR SIPHON PIPING INSTALLATION PRIOR TO DESIGN OR INSTALLATION. <br /> �`. TANK PAD 2 9 2" INSIDE 3" FIBERGLASS j <br /> a ° ° a 19 VENT PIPING a + 17 INSTALL WAYNE OVATION SERIES, SINGLE HOSE PER SIDE, MULTI-PRODUCT DISPENSERS AS SHOWN. DISPENSERS TO BE FITTED WITH STAGE 11 HOSES, rn <br /> TK#2 1 NOZZLES AND BREAKAWAY VALVES PER LOCAL REQUIREMENTS. CONTRACTOR IS RESPONSIBLE FOR INSTALLING HOSES, NOZZLES AND BREAKAWAYS. <br /> TURBINE(E)CD- 4 �K 1 � PREMIUM 20 OVERFILL ALARM/STROBE AND ° INSTALL UNDER DISPENSER CONTAINMENT INCLUDING PRODUCT AND VAPOR SHEAR <br /> ol <br /> REGULAR UNLEADED ACKNOWLEDGE SWITCH + R HER VALVES AND MONITORING SENSORS. START UP BY MANUFACTURER <br /> REGULAR <br /> R 20 ® 12K INSTALL EMERGENCY PUMP SHUTOFF + REPRESENTATIVE. GENERAL CONTRACTOR TO PURGE LINES WITH A MINIMUM OF 200 GALLONS THROUGH EACH HOSE/NOZZLE. ANY AIR POCKETS OR <br /> . . TANK LEVEL GAUGE 14 1 START UP PROBLEMS DUE TO IMPROPER INSTALLATION OR INCORRECT WIRING THAT DESTROYS ELECTRONICS WILL BE BILLED BACK TO THE <br /> STATIC ° ° SWITCH AND WEATHER PROOF EW ASPHALT ° .4. + CONTRACTOR. AFTER PURGING THE PRODUCT LINES OF AIR AND BEFORE VAPOR RECOVERY TESTING, CONTRACTOR IS TO REPLACE THE FACTORY `' <br /> GROUND VENT, STAGE I & STAGE 11 13 4 OUTLET PER FIRE CODE PAVING, TYP 1 �� / V <br /> ., .'ROD-'. VAPOR RETURN lg 15 HYDROSTATIC 12 TURBINE 11 5 REQUIREMENTS d I INSTALLED GASOLINE FILTERS WITH NEW FILTERS. OF <br /> Or�� <br /> MONITOR + 18 INSTALL VEEDER-ROOT CARBON CANISTER VAPOR POLISHER ON 2" VENT RISER PIPE <br /> VEEDER-ROOT CARBON CANISTER 1g 40 + 0 O 9 <br /> a O VAPOR POLISHER �\ 19 ALL NEW PIPING AND TANKS TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS. <br /> (2) 2" DIA. GALV. STEEL VENT 10 a 20 INSTALL OVERFILL ALARM & ACKNOWLEDGMENT SWITCH, ESO AND MAINTENANCE RECEPTACLE IN LOCATION SHOWN. ALARM AND SWITCH TO BE LOCATED <br /> RISERS WRAPPED TO GRADE. PAINT ° I TO PROVIDE AN UNOBSTRUCTED VIEW TO TRUCK DRIVER. PROVIDE BOLLARD PROTECTION OF FREE STANDING POLE. SEE WIRING DIAGRAM AND DETAIL FOR <br /> TO MATCH SITE CONDITIONS ROUTE r MOUNTING REQUIREMENTS. <br /> CONDUITS TO <br /> Q41 INTRINSICALLY SAFE WIRE AY °SPARE 1o t s <br /> 21 FINAL FACILITY EQUIPMENT LOCATIONS TO BE APPROVED BY DISTRIBUTION TERMINAL MANAGER PRIOR TO SUBMITTAL FOR PERMITS TO ENSURE CLEAR <br /> °`+ a I AND SAFE ACCESS TO THE UNDERGROUND TANKS FOR UNLOADING OPERATIONS. <br /> 4 ° d EMERGENCY PUMP ® -- ------- ----� <br /> \ OFFSWITCH <br /> ---- <br /> SHUT-OFF I OUTDOOR) <br /> GENERAL COMPLIANCE NO 9 <br /> RESET SWITCH INDOOR DEVELOPMENT INFORMATION: <br /> 1. ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR REFERENCING ALL DIMENSIONS, PROPERTY LINES, ARCO M <br /> \ \ a Fol O _ ELEVATIONS AND EQUIPMENT LOCATIONS ��� ��� � <br /> ' 2. ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. ANY <br /> DISCREPANCY SHALL BE CALLED TO THE ATTENTION OF THE OWNERS ENGINEER FOR HIS DECISION BEFORE PROCEEDING WITH ���� CANOPY <br /> 8 VEEDER ROOT THE WORK. <br /> \ ALARM MONITO i s <br /> SYSTEM 0; 3. GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR EXCAVATIONS OF TRENCHES " <br /> � 5-0 <br /> G I OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. <br /> \ i 4. AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK <br /> \ _ ( <br /> OPERATIONS. <br /> \ \ , SITE ADDRESS: <br /> i 5. ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NATIONALLY RECOGNIZED CODES, LOCAL //�� �@� <br /> CODES AND GOVERNING AUTHORITIES. ESM �1NJl <br /> 6. THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE PRODUCT STORED. Av <br /> \ \ <br /> r 7. ALL MONITORING DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. O CA <br /> Q �%' 8. GENERAL CONTRACTOR IS REQUIRED TO PROVIDE 72 HOUR (TYPICAL) NOTIFICATION TO GOVERNING AGENCY PRIOR TO TANK <br /> \ \ INSTALLATION. ����� <br /> 9• TANK AND PIPING SYSTEM TO BE INSPECTED BY OWNER'S THIRD PARTY INSPECTOR & GOVERNING AGENCY AT FOUR (4) <br /> \ SEPARATE CONSTRUCTION PHASES (SEE SPECIFICATIONS): <br /> \ \ _ A. TANK AIR TEST BEFORE SETTING IN HOLE AND SOAP TEST. DEMNED BY: ALUANCE MDM: <br /> B. TANKS AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR 30 MINUTES. AL <br /> �- C. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN ACCORDANCE WITH CHECKED BY: BP REPM: <br /> MANUFACTURER'S GUIDELINES. <br /> OV <br /> D. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION SYSTEM. AL <br /> DRAM BY: ALLIANCE PM: <br /> 10. ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY TESTED (LAKE TEST) WITH VERSION: �y PROJECT NO: <br /> 0 10 20 40 RSTANDING WATER ECORD THE TEST RESULTS TOP TOF REDUCING COLLAR FOR <br /> R. A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT. �+®� _® 17223 <br /> 12/14/2015 <br /> 11. TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVERNING DRAWING TITLE: <br /> AGENCY PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION. <br /> \ I ®� 9 12. PRIOR TO FUEL BEING PUMPED, STATION MUST HAVE VEEDER ROOT FUNCTIONAL AND MONITORING ANNULAR SPACES OF TANK UNDERGROUND TANK AND PIPING <br /> \ \ hl y AND DISPENSER SUMPS. SITE PLAN <br /> \ 13. PAYMENT OF ALL APPLICABLE UST OPERATING FEES SHALL BE SUBMITTED TO THE GOVERNING JURISDICTIONWITHIN 30 A ® INSTALLATION NOTES <br /> 14. RESPONSIBILITY HALL BE SUBMITTED TO GOVERNING AGENCY ( Y B ) <br /> DAYS OF THE FINAL INSPECTION <br /> \ UNDERGROUND TANK AND PIMNG SITE PLAN EVIDENCE OF FINANCIAL RESPONS TY S B P . <br /> 15. MEASUREMENTS OF BRINE LEVELS IN TANKS SHALL BE TAKEN BY BP REPRESENTATIVE DURING THREE SEPARATE VISITS TO SITE SHEET NO: <br /> AND PRIOR TO FUELING OPERATIONS. REFER TO TANK MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR REQUIREMENTS. <br /> M <br />