TANK AND PIPING
<br /> OF
<br /> R © CUENT:
<br /> bpGENERAL: TOP OF TANK ELEVATION: ARCO LARGE SITE VARIANT — IF SITE HAS 9 OR MORE MPDS, TWO (2) 2 HP VARIABLE SPEED TURBINES ARE TO BE INSTALLED IN THE PRIMARY
<br /> SCOPE OF WORK: UNLESS SPECIFIED OTHERWISE ON THESE DRAWINGS, THE GENERAL CONTRACTOR SHALL FURNISH ALL WORK AND MATERIALS TO CONTRACTOR TO,CALCULATE TOP OF TANK ELEVATION. START WITH 18" MINIMUM DEPTH OF VAPOR RECOVERY LINE AT THE FARTHEST DISPENSER REGULAR UNLEADED TANK. THE REGULAR UNLEADED TURBINES SHALL BE SET UP AS "MASTER/SLAVE/SLAVE" AND THE CROSS CONNECTION
<br /> COMPLETE THE INSTALLATION OF THE SYSTEMS AND EQUIPMENT SHOWN IN THESE DRAWINGS AND AS REQUIRED BY PROJECT DOCUMENTS PROVIDED AND SLOPE 1/4 PER FOOT MAXIMUM TO 1/8" PER FOOT MINIMUM. ADD 12" AT THE TANK. ADD 13" (FOR 3" PIPE) OR 8" (FOR 2") FOR A MANIFOLD BETWEEN TANKS SHALL BE OPENED ALLOWING ALL THREE TURBINES TO SERVE THE NTIRSITE.
<br /> TO THE CONTRACTOR. CHANGE IN PIPING DIRECTION OTHER THAN 90 OR 45 DEGREES. SET TANKS 6" DEEPER THAN CALCULATED AS PRECAUTION. IN NO EVENT SHALLr` .
<br /> THE TANK BE BURIED LESS THAN 4'-0" BELOW FINISHED GRADE OR DEEPER THAN 7'-0" BELOW FINISHED GRADE. SEE MANUFACTURERSr <<_
<br /> WHERE THESE DRAWINGS DIFFER FROM LOCAL REGULATIONS, LOCAL REGULATIONS WILL SUPERSEDE THESE DRAWINGS IF THEY ARE MORE STRINGENT. INSTALLATION INSTRUCTIONS FOR MINIMAL TANK BURY WHEN DEADMEN ANCHORING IS NOT PROVIDED. ANY VARIATIONS IN SLOPE FROM 1/4" PER
<br /> NOTE: FOOT SHALL BE REPORTED TO OWNER'S ENGINEER. y'
<br /> THESE GUIDELINES APPLY ONLY TO UNDERGROUND STORAGE TANKS AND PRODUCT PIPING. REFER TO BALANCE OF SITE SPECIFIC DOCUMENTS/ TANK EXCAVATION:
<br /> DRAWINGS FOR SPECIFICATIONS REGARDING CONCRETE/ASPHALT INSTALLATION, ELECTRICAL REQUIREMENTS, AND SANITARY & STORM SEWERS CONTRACTOR TO EXCAVATE TANK HOLE. CONTRACTOR SHALL ADHERE TO O.S.H.A. STANDARDS ON EXCAVATIONS. CONTRACTOR MAY SELECT ANY OF
<br /> INSTALLATION. THE RECOMMENDED PRACTICES FOR TANK EXCAVATION AND MUST PROVIDE ALL NECESSARY PROTECTIVE BARRICADES.
<br /> * ` WHERE MULTIPLE VERSIONS OF THE SAME SHEET EXIST, INSERT SLOPE SIDES OF TANK HOLE OR USE SHORING FOR ALL TANK EXCAVATIONS IN ACCORDANCE WITH OSHA 1926 SUBPART P, OSHA
<br /> THE SHEET APPROPRIATE FOR THE SPECIFIC STATION LAYOUT. STANDARDS — EXCAVATIONS; FINAL RULE OCTOBER 1, 1989. WHEN ENGINEERED SHORING IS REQUIRED DUE TO SITE CONDITIONS AN
<br /> ENGINEERED SHORING PLAN UTILIZING INTERLOCKING STEEL SHEET PILING SHALL BE PROVIDED AND SHALL INCLUDE SUPPORTING (7) SIPHON LINE INSTALLATION:
<br /> ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR REFERENCING ALL DIMENSIONS, PROPERTY LINES, ELEVATIONS AND ENGINEERING CALCULATIONS BY A STATE CERTIFIED ENGINEER AND SHALL BE THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR.
<br /> EQUIPMENT LOCATIONS STANDARD: WHEN SITE SPECIFIC TANK CONFIGURATION SHOWS MULTIPLE TANKS FOR IDENTICAL PRODUCTS, CONTRACTOR TO INSTALL 4" OVER 3" 4 kL
<br /> GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR EXCAVATIONS OF TRENCHES 5'-0" OR MORE DOUBLE WALL FIBERGLASS SIPHON LINES AND PIPING CONNECTION VALVES AND FITTINGS BETWEEN TANKS. INSTALL SIPHON PIPING AS LOW AS
<br /> ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. ANY DISCREPANCY SHALL IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. POSSIBLE IN SUMP. NOTE LIMITATION ON MAXIMUM SIPHON PIPING SYSTEM HEIGHT ON DETAILS. ADJUST HEIGHT DOWN FOR SMALLER DIAMETER
<br /> BE CALLED TO THE ATTENTION OF THE OWNERS ENGINEER FOR HIS DECISION BEFORE PROCEEDING WITH THE WORK. TANK EXCAVATIONS SHALL BE THE MINIMUM SIZE REQUIRED TO PROVIDE FOR BEDDING AND CLEARANCES INDICATED IN THESE DRAWINGS. TANK TANKS. CONTRACTOR TO INSTALL VEEDER ROOT SIPHON BREAK OPTION IF APPROPRIATE FOR MARKET CONDITIONS. SEE APPROPRIATE SITE SPECIFIC
<br /> ALL REQUESTS TO ADD, DELETE, OR SUBSTITUTE MATERIAL AND EQUIPMENT SHOWN ON THESE DRAWINGS MUST BE REVIEWED AND APPROVED BY BURIAL DEPTH FIELD DETERMINED TO PROVIDE FOR 1/4" (1/8" PER FOOT MIN.) PER FOOT FOR STAGE 11 VAPOR RECOVERY PIPING & 1/8" DRAWINGS FOR INSTALLATION DETAILS.
<br /> THE OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER, IN CHARGE OF THE PROJECT. ALL CHANGES MUST BE REVIEWED WITH MINIMUM PER FOOT FOR PRODUCT PIPING SLOPE BACK FROM DISPENSERS TO TANK.
<br /> THE MARKETING FUELS MANAGER. TANK STABILITY BUOYANCY CALCULATIONS:
<br /> THE CONTRACTOR IS REQUIRED TO FURNISH AS—BUILT DRAWINGS TO LOCATE TANKS AND PIPING AS INSTALLED AFTER THE COMPLETION OF THE TANK STABILITY SHALL BE RE—CHECKED AGAINST FLOATATION BY INSTALLING CONTRACTOR. SEE BUOYANCY CALCULATIONS ON TANK DETAILING SHEETS. ARCO BRANDED VARIANT: CONTRACTOR TO INSTALL 4" OVER 3" DOUBLE WALL FIBERGLASS SIPHON PIPING. SIPHON BREAK OPTION IS NOT
<br /> PROJECT. TANK ANCHORING: INSTALLED. INSTALL SIPHON PIPING AS LOW AS POSSIBLE IN SUMP. NOTE LIMITATION ON MAXIMUM SIPHON PIPING SYSTEM HEIGHT ON DETAILS.
<br /> (1 ) TANK INSTALLATION: CONTRACTOR TO INSTALL MANUFACTURER SUPPLIED TANK HOLD DOWN STRAPS & ANCHORS WHEN REQUIRED DUE TO HIGH WATER TABLE, LOCAL
<br /> ADJUST HEIGHT DOWN FOR SMALLER DIAMETER TANKS. SEE APPROPRIATE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS. ptcm- T F-Imm LLC
<br /> REGULATIONS, OR SPECIFIED BY SITE ENGINEER/DESIGNER AND/OR OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER. WHEN CALIFORNIA VARIANT: SIPHON PIPING TO BE INSTALLED WITH CONTINUOUS VACUUM MONITORING DEVICE PER AB-2481 REQUIREMENTS
<br /> STANDARD: CONTRACTOR TO INSTALL DOUBLE WALL FIBERGLASS TANKS WITH COMPLETE "VEEDER ROOT" TLS-350 TANK AND PIPING MONITORING AND REQUIRED, THE ANCHORING SYSTEM SHALL BE IN COMPLIANCE WITH AUTHORITY HAVING JURISDICTION. ANCHOR & STRAPS TO BE INSTALLED ACCORDING TO
<br /> ALARM SYSTEM. TANKS TO BE SET MIN. 48" BELOW FINISH GRADE. SEE SITE SPECIFIC INSTALLATION DETAILS FOR TANK SIZES AND LOCATIONS. MANUFACTURER'S INSTRUCTIONS. (8) PRODUCT PIPING INSTALLATION:
<br /> NYC VARIANT: INSTALL TOP AND BOTTOM SLAB AND SLAB PIER SUPPORT SYSTEM PER NYC STANDARDS. ALTERNATE ANCHORING BY USE OF A CONCRETE ANCHORING SLAB IS PERMITTED. WHEN GROUNDWATER LEVEL IS ANTICIPATED TO BE
<br /> WITHIN 5 FT. OF GRADE CONTRACTOR SHALL NOTIFY OWNER' STANDARD: CONTRACTOR TO INSTALL DOUBLE WALL FIBERGLASS PRODUCT PIPING, CONNECTORS, VALVES AND FITTINGS IN TANK AND DISPENSER
<br /> S REPRESENTATIVE FOR DIRECTION ON ANCHORING METHOD TO BE USED
<br /> ARCO BRANDED VARIANT: DUAL FILLS AND STAGE I VAPOR RETURNS TO BE INSTALLED ON 20,000 GALLON TANK ONLY. SUMPS AS SHOWN ON SITE SPECIFIC DETAIL DRAWINGS TO SUPPLY DISPENSERS. PRODUCT PIPING TO BE N.O.V. RED THREAD IIA, 2" INSIDE 3"
<br /> TANK SIZING GUIDELINES: (DEADMAN OR ANCHORING SLAB) AND SUCH SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S RECOMMENDATION. IT
<br /> DIAMETER AS INDICATED ON SITE SPECIFIC FUELING PLAN. ALL PIPING AND FITTINGS SHALL BE UL-971 LISTED IN COMPLIANCE WITH THE JULY 2005
<br /> SPECIFIC BUSINESS UNIT TANK SIZE REQUIREMENTS ARE RECOMMENDED. TANK SIZING MODELS CAN BE RUN BY CONTACTING FUEL SYSTEM DESIGN THIS PROCEDURE IS REQUIRED IN NYC AND CONSIDERED PART OF SCOPE OF WORK WHEN INSTALLING TANKS IN NYC. PERFORMANCE STANDARDS, AND SHALL BE COMPATIBLE WITH ETHANOL, INCLUDING BUT NOT LIMITED TO "FLEX FUEL" (85% ETHANOL 15% GASOLINE).
<br /> MANAGER AMERICAS. NYC VARIANT: IT IS THE CONTRACTORS RESPONSIBILITY TO PROVIDE FOR THE INSTALLATION OF A 12" CONCRETE ANCHORING SLAB. 4,000 PRODUCTS LINES TO BE EQUIPPED 3 GPH PRESSURE LINE LEAK DETECTORS (PLLD) ON TURBINES AND WITH LIQUID LEAK MONITORING SENSORS
<br /> LOCATION OF TANKS AND ASSOCIATED EQUIPMENT ON PROPERTY: FINAL FACILITY EQUIPMENT LOCATIONS INCLUDING PLACEMENT AND PSI AT 28 DAYS WITH (2) LAYERS OF 6x6—w5.5xw5.5 ON 2" STEEL CHAIRS TOP & BOTTOM LOCATED IN TURBINE PIPING SUMPS ATTACHED TO TANKS WIRED FOR TURBINE SHUT DOWN. PRODUCT PIPING IN TURBINE SUMPS, PRODUCT PIPING
<br /> ORIENTATION OF TANKS, EMERGENCY SHUTOFF SWITCHES, OVERFILL ALARMS IF PRESENT TO BE APPROVED BY BP DISTRIBUTION PRIOR
<br /> ( ) CROSS CONNECTION MANIFOLDS BETWEEN SUMPS AND SIPHON PIPING PENETRATIONS ARE TO ENTER THE SAME SIDE OF THE SUMP IF POSSIBLE. IF -91
<br /> TO SUBMITTAL FOR PERMITS TO ENSURE CLEAR AND SAFE ACCESS TO THE UNDERGROUND TANKS FOR UNLOADING OPERATIONS. THE FILTER FABRIC: IT IS THE CONTRACTORS RESPONSIBILITY TO PROVIDE FOR THE INSTALLATION OF FILTER FABRIC (DUPONT TYPAR OR MIRAFI PRODUCT 0
<br /> PENETRATION ENTERS ON BOTH SIDES OF SUMP DUE TO FIELD CONDITIONS, THEN DUAL SENSORS AT TURBINE SUMP MAY BE REQUIRED �W
<br /> GENERAL CONTRACTOR IS RESPONSIBLE FOR CONFIRMING APPROVED TANK AND EQUIPMENT LOCATIONS HAS BEEN DOCUMENTED W/ BP 500X) WHICH IS REQUIRED FOR WET HOLE INSTALLATIONS ONLY. FABRIC MUST EXTEND 1' ABOVE MAX. HIGH WATER TABLE AND MAY BE �
<br /> DISTRIBUTION, THE SITE ENGINEER AND/OR OWNERS REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER PRIOR TO THE PINNED TO SIDE OF HOLE WITH WIRE, ETC. SEAMS MUST BE LAPPED 1' MINIMUM. TO BE INSTALLED BY LOCAL REGULATIONS. IF THE BP PROJECT MANAGER DETERMINES THAT THE ALL THE PIPING ENTRIES NOTED ABOVE COULD
<br /> COMMENCEMENT OF WORK. HAVE BEEN MADE TO THE SAME SIDE OF THE SUMP, THEN ANY COSTS ASSOCIATED WITH EXTRA SENSORS SHALL BE BORNE BY THE INSTALLING EAG®
<br /> TANKS: WET HOLE BALLAST OPTION: CONTRACTOR. PIPING TO BE INSTALLED WITH A SLOPE OF 1/8- PER FOOT MINIMUM TO TANKS UNLESS APPROVED BY OWNER. CONTRACTOR TO
<br /> SHALL BE UNDERWRITERS LABORATORY APPROVED LISTED FOR THE UNDERGROUND STORAGE OF ALL FLAMMABLE AND COMBUSTIBLE MOTOR FUELS WATER IS THE SUITABLE MEDIUM FOR BALLAST DURING WET HOLE TANK INSTALLATIONS. A PROPERLY INSTALLED 12 FOOT HIGH TEMPORARY VENT PIPE INSTALL TRACER TAPE WITH PRODUCT PIPING PER TRENCHING DETAILS. PENETRATIONS INTO ALL SUMPS SHALL BE MADE WITH DOUBLE WALL FRP 18215 72ND AVENUE SOUTH
<br /> AS CALLED FOR ON THE SITE SPECIFIC DRAWING OR AS DESIGNATED ON THE SUPPLEMENTAL CONDITIONS AND SHALL BE DOUBLE WALL TANKS OF MUST BE INSTALLED BY THE CONTRACTOR. IF WATER IS USED TO BALLAST TANKS, THE WATER IS TO BE COMPLETELY PUMPED OUT & MOPPED DRY IN ENTRY FITTINGS TESTING OF PRODUCT LINES SHALL BE PERFORMED PRIOR TO BACK FILL PRIOR TO PAVING AND BEFORE STATION OPERATION. SEE KENT WA 98032
<br /> FIBERGLASS REINFORCED PLASTIC (FRP). INSTALLATION OF TANKS AND PIPING SHALL BE IN ACCORDANCE WITH U.L. LISTED MANUFACTURER'S ORDER TO PROTECT FUEL INTEGRITY. CONTRACTOR IS REQUIRED TO COORDINATE BALLASTING OPERATIONS WITH OWNER'S REPRESENTATIVE OR HIS AGENT, SITE SPECIFIC DETAIL SHEETS FOR INSTALLATION DETAILS.
<br /> INSTRUCTIONS. INSTALLATION SHALL CONFORM TO NFPA-30/30A AND ALL APPLICABLE LOCAL, STATE AND FEDERAL REGULATIONS. TANKS SHALL THE BP PROJECT MANAGER. IT IS THE INSTALLING CONTRACTORS RESPONSIBILITY TO DETERMINE THE JURISDICTIONAL REQUIREMENTS AND ACCEPTANCE (425)251-6222
<br /> ONLY BE INSTALLED BY QUALIFIED INSTALLERS CERTIFIED BY THE STATE IN WHICH THE TANKS ARE TO BE INSTALLED AND BY THE TANK FOR BALLASTING THE TANKS AND TO PROVIDE FOR PROPER DISPOSAL OF THE BALLASTING MEDIUM UNDER THE REGULATIONS OF THE GOVERNING NOTE'� "FIBERCAST SYSTEMS" PIPING TO BE INSTALLED PER MANUFACTURER'S INSTALLATION MANUAL AND SHALL ONLY BE INSTALLED BY (425)251-8782 FAX
<br /> MANUFACTURER, AUTHORITY. QUALIFIED INSTALLERS CERTIFIED BY THE MANUFACTURER.
<br /> THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE PRODUCT STORED. ALL CONTINUOUS MONITORING CALIFORNIA VARIANT: IN ADDITION TO THE ABOVE, PIPING TO BE INSTALLED WITH CONTINUOUS VACUUM MONITORING DEVICE PER AB-2481 CML ENGINEERING, LAND PLANNING,
<br /> DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. BACK FILL: REQUIREMENTS SURVEYING, ENVIRONMENTAL SERVICES
<br /> CONTRACTOR TO PROVIDE ALL BACK FILL REQUIRED FOR THE PROJECT SCOPE. PEA GRAVEL SHALL CONSIST OF NATURALLY ROUNDED AGGREGATE,
<br /> ALL MATERIALS USED IN THE INSTALLATION SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NATIONALLY MINIMUM 1/8" AND MAXIMUM 3/4" SIZE. FREE OF CLAY, SLAG, CINDERS, OR DEBRIS. ALL SUBSTITUTES MUST BE APPROVED BY MANUFACTURER AND (g VENT PIPING INSTALLATION: NO. DATE REVISION DESCRIPTION
<br /> RECOGNIZED CODES, LOCAL CODES AND GOVERNING AUTHORITIES. OWNERS FIELD REPRESENTATIVE.
<br /> 9
<br /> METHANOL COMPATIBILITY: FOR ALL METHANOL COMPATIBLE STORAGE SYSTEMS, ALL READILY ACCESSIBLE COMPONENTS SHALL BE METHANOL STANDARD: CONTRACTOR TO INSTALL 2" INDIVIDUAL SINGLE WALL FIBERGLASS VENT PIPING, CONNECTORS, VALVES AND FITTINGS ON TANKS AS
<br /> COMPATIBLE FOR THE IMMEDIATE INTENDED SERVICE. NO MORE THAN 5% (BY WEIGHT) MAY PASS THE #8 SIEVE FOR BACK FILLING NONMETALLIC TANKS WITH A 96% TO 98% FREE FALL COMPACTION. DRY INDICATED ON SITE SPECIFIC FUELING PLAN AND ACCOMPANYING DETAILS. CONTRACTOR TO PROVIDE AT LEAST 4 FEET OF PIPING RUN BEFORE A 2
<br /> PEA GRAVEL DENSITY MINIMUM OF 95 POUNDS PER CUBIC FOOT IS REQUIRED. SUPPLY QUARRY CERTIFICATION MEETING ASTM C-33, PARAGRAPH 9.1
<br /> BIO—DIESEL COMPATIBILITY: CURRENTLY AT THIS TIME, NO TANKS ARE LISTED FOR BIO—DIESEL SERVICE APPLICATIONS. REQUIREMENTS. CHANGE OF DIRECTION OF 30 DEGREES OR MORE IN ORDER TO PROVIDE MECHANICAL FLEXIBILITY PER CODE REQUIREMENTS. CONTRACTOR TO s
<br /> INSTALL TRACER TAPE WITH VENT PIPING PER TRENCHING DETAILS. PENETRATIONS INTO ALL SUMPS SHALL BE MADE WITH SINGLE WALL ENTRY
<br /> BACK FILLING OF TANK EXCAVATIONS SHALL BE PROVIDED IN LIFTS AS PER TANK MANUFACTURER'S INSTALLATION INSTRUCTIONS. FITTINGS. VENT PIPING SHALL BE DESIGNED AND INSTALLED FOR SLOPE 1/4" PER FOOT MINIMUM BACK TO TANKS. FOR LONG PIPING RUNS 1/8" 4
<br /> INITIAL TANK TESTING: PRODUCT, VENT, AND VAPOR PIPING SHALL BE LAID AND CONTINUOUSLY SUPPORTED ON A 6" BED OF COMPACTED PEA GRAVEL. BLOCKS, PLANKS, PER FOOT IS ACCEPTABLE. O
<br /> CONTRACTOR SHALL COMPLETE ALL TESTING ACCORDING TO MANUFACTURERS INSTRUCTIONS FOR TANKS. CONTRACTOR SHALL COMPLETE ALL OR OTHER DEBRIS SHALL NOT BE USED TO SUPPORT PIPING IN FINAL INSTALLATION.
<br /> CONTRACTOR TO INSTALL ABOVE GROUND RISERS AND MOUNTING RACK AS DETAILED ON THESE PLANS. TERMINATION POINT OF TANK VENTS TO BE
<br /> WARRANTY VALIDATION TESTING AND PROVIDE DOCUMENTATION TO OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER.
<br /> NOTE: UNDER NO CIRCUMSTANCES SHALL DIRT, PAVING MATERIALS, WOOD, OR OTHER CONSTRUCTION DEBRIS BE ALLOWED TO REMAIN IN TANK AND A MINIMUM OF 12' ABOVE GRADE AND NOT WITHIN 5' FROM ANY BUILDING OPENING OR PROPERTY LINE THAT CAN BE BUILT UPON. VENT RISERS
<br /> PIPE EXCAVATIONS. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA-30, INTERNATIONAL AND UNIFORM FIRE CODE REQUIREMENTS AND CARR EVR REQUIREMENTS.
<br /> IMMEDIATELY BEFORE INSTALLATION, ALL UNDERGROUND STORAGE TANKS SHALL BE TESTED. HYDROSTATICALLY MONITORED DOUBLE WALL TANKS
<br /> SHALL BE TESTED ACCORDING TO MANUFACTURER'S INSTRUCTIONS BY: (2) ANNULAR SPACE HYDROSTATIC MONITOR AND RISER INSTALLATION: 0
<br /> INSPECT AND ADJUST RESERVOIR LEVEL oa CONTRACTOR TO INSTALL TWO (2) 1" SPARE CONDUITS FROM VENT STACK TO INTRINSICALLY SAFE WIREWAY IN BUILDING FOR FUTURE TANK SYSTEM a
<br /> STANDARD: CONTRACTOR TO INSTALL 4 FIBERGLASS RISER AND VEEDER ROOT HYDROSTATIC SENSOR AT TANK ANNULAR SPACE LOCATION NOTED DIAGNOSTICS.
<br /> VISUALLY INSPECT THE TANK EXTERIOR FOR COLORED MONITORING FLUID ON THE PLANS PER MANUFACTURERS INSTRUCTIONS.
<br /> * PRESSURIZE THE PRIMARY TANK TO 5 PSI AND SOAP TEST ALL FITTINGS. DO NOT PRESSURIZE THE ANNULAR SPACE
<br /> * VISUALLY INSPECT THE TANK INTERIOR FOR ACCUMULATION OF COLORED MONITORING FLUID. (3) TANK SUMP INSTALLATION: CONTRACTOR TESTING OF VENT LINES SHALL BE PERFORMED PRIOR TO BACK FILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. SEE SITE 0
<br /> SPECIFIC DETAIL SHEETS FOR INSTALLATION DETAILS. SEE FIBERGLASS PIPING MANUFACTURER SPECIFICATION BELOW. 91
<br /> ***NOTE*** HYDROSTATIC FLUID RESERVOIR LEVEL MUST BE RECHECKED TO VERIFY TANK INTEGRITY PRIOR TO INTRODUCING BALLAST INTO TANKS. STANDARD: CONTRACTOR TO INSTALL 42" OR 48" DIAMETER TURBINE SIDE FIBERGLASS POLYSIDED SUMPS ON TANKS PER MANUFACTURER'S
<br /> INSTRUCTIONS. NOTE THAT THE ORIENTATION OF THE TANK SUMPS MUST BE CORRECT IN ORDER TO FACILITATE CORRECT PIPING INSTALLATION INTO VENT PIPING SPECIFICATION: 12
<br /> FIELD REPAIR OF TANKS: IT IS ALLOWABLE TO FIELD REPAIR DAMAGED TANKS AFTER APPROVAL BY BP FILED ENGINEER. ALL TANKS DAMAGED IN THE SUMPS. SEE ACCOMPANYING DETAILS IN PLAN SET AND NOTE SIZES OF SUMPS PER PROJECT DEMOGRAPHICS. sEAU
<br /> FIBERCAST SYSTEMS: RED THREAD II PIPE AND FITTINGS (USED FOR SINGLE WALL). WHERE DOUBLE WALL SYSTEMS ARE REQUIRED FOR ALL VENT Q�oFESSI 2
<br /> TRANSPORT OR OFF LOADING OPERATIONS SHALL BE FIELD REPAIRED BY A TANK MANUFACTURER'S CERTIFIED FIELD SERVICE REPRESENTATIVE. TANK AND VAPOR PIPING, USE SIZE OVER SIZE RED THREAD 11 PIPING AND FITTINGS. USE ONLY FIBERCAST SYSTEMS ALCOHOL COMPATIBLE ADHESIVES.
<br /> —CERTIFY REPAIRED TANKS FOR USE. ALL FIELD SERVICE WORK SHALL BE DOCUMENTED. COPIES OF ANY AND ALL FIELD ALL PIPING AND FITTINGS SHALL BE UL-971 LISTED IN COMPLIANCE WITH THE JULY 2005 PERFORMANCE STANDARDS.
<br /> MANUFACTURER SHALL RE
<br /> SERVICE DOCUMENTATION SHALL BE PLACED IN THE PROJECT FILE AND INTO OWNERS OPERATING FILE. ARCO BRANDED VARIANT: 48" DIAMETER TURBINE SUMPS ARE INSTALLED.
<br /> PIPING TO BE INSTALLED PER MANUFACTURER'S LISTED INSTRUCTIONS AND SHALL ONLY BE INSTALLED BY QUALIFIED INSTALLERS CERTIFIED BY THE
<br /> TANK MEASUREMENTS:
<br /> THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE FOLLOWING TANK MEASUREMENT ACTIVITIES: CALIFORNIA VARIANT: 42" DIAMETER FILL SUMPS TO BE DOUBLE WALLED AND INSTALLED WITH CONTINUOUS HYDROSTATIC MONITORING DEVICE PER MANUFACTURER. PROVIDE AT LEAST 4 OF STRAIGHT PIPING RUN BEFORE A CHANGE OF DIRECTION OF MORE THAN 30 DEGREES AND INSTALL � 9 �
<br /> 1. VERIFY THE EXTERNAL SIZE OF THE TANK TO MATCH WITH MANUFACTURER SUPPLIED SHOP MEASUREMENTS. AB-2481 REQUIREMENTS. FLEXIBLE CONNECTORS AT THE VENT AND VAPOR CONNECTION AT THE TANK SUMPS, AND DISPENSER SUMPS.
<br /> TRANSFER THE SIZE, SERIAL NUMBER, AND PRODUCT INSTALLED, AND POSITION OF TANK TO THE AS—BUILT PLAN.
<br /> 2. TRANSFER TANK DIMENSIONAL AND PRODUCT INFORMATION TO THE DATA SHEET IN THE TANK GAUGE CONSOLE. (4) TANK LEVEL GAUGE OVERFLOW PROTECTION: \�
<br /> 3. PROVIDE THE TOP OF TANK ELEVATION READING AT BOTH ENDS OF EACH TANK. STANDARD: CONTRACTOR TO INSTALL VEEDER ROOT MAGNOSTRICTIVE PROBE LEVEL GAUGE AT LOCATION NOTED ON PLANS PER MANUFACTURER'S -q�, Cl
<br /> TANK DEFLECTION MEASUREMENT PROCEDURE: INSTALLATION INSTRUCTIONS. JURISDICTIONAL VARIANT: INSTALL DOUBLE WALL SIZE OVER SIZE FIBERGLASS PIPING WHEN REQUIRED BY AUTHORITY HAVING JURISDICTION. ®Fr'
<br /> DEFLECTION MEASUREMENT BEFORE AND AFTER TANK INSTALLATION SHALL BE ACCORDING TO MANUFACTURER'S REQUIREMENTS AND SHALL BE OVERFLOW PROTECTION: UST OVERFLOW COMPLIANCE IS ACHIEVED BY USE OF OVERFLOW PREVENTION DROP TUBE FLAPPER VALVE SET AT 95% AND
<br /> WITHIN MANUFACTURER'S TOLERANCES. ALL INFORMATION SHALL BE COMPLETED AS PER THE MANUFACTURER'S WARRANTY DOCUMENTATION. IS IN ACCORDANCE WITH FEDERAL AND STATE GUIDELINES FOR UST OVERFILL REQUIREMENTS. CALIFORNIA VARIANT. VENT PIPING TO BE DOUBLE WALLED AND INSTALLED WITH CONTINUOUS VACUUM MONITORING DEVICE PER AB-2481
<br /> REQUIREMENTS
<br /> AN OVERFILL ALARM AND ACKNOWLEDGE SWITCH TIED INTO THE VEEDER ROOT AUTOMATIC TANK GAUGE SYSTEM. THE MONITORING SYSTEM PROVIDES
<br /> AN AUDIBLE AND VISUAL ALARM WHEN THE TANK(S) ARE FILLED TO THE 90% LEVEL. (10) STAGE II VAPOR RECOVERY PIPING INSTALLATION:
<br /> STANDARD: CONTRACTOR TO INSTALL 3" SINGLE WALL FIBERGLASS STAGE II VAPOR RECOVERY HEADER, CONNECTORS, VALVES AND FITTINGS TO THE
<br /> (5) FILL AND STAGE I VAPOR RECOVERY INSTALLATION: LOWEST OCTANE GRADE AS INDICATED ON SITE SPECIFIC FUELING PLAN AND ACCOMPANYING DETAILS. NOTE THAT THE 1ST CONNECTION FROM STAGE
<br /> STANDARD: CONTRACTOR TO INSTALL 4" GALVANIZED FILL AND STAGE I VAPOR RECOVERY RISERS. CONTRACTOR TO INSTALL DROP TUBE ASSEMBLY. 11 VAPOR RECOVERY HEADER TO LOWEST OCTANE TANK SHALL BE 3". ALL OTHER CONNECTIONS TO ADDITIONAL TANKS SHALL BE MADE WITH 2".
<br /> DOUBLE WALLWITH OVERFILL PREVENTION DROP TUBE. CONTRACTOR TO INSTALL VENT AND STAGE II FLEX CONNECTORS AND FRP ADAPTERS. LOCATE AND CUT CONTRACTOR TO INSTALL 3" TO 2" REDUCING TEES WHERE HEADERS BRANCH TO DISPENSERS. MAXIMUM (2) DISPENSERS PER 2" BRANCH.
<br /> „
<br /> FRP TANK I.D.= A„ PENETRATIONS INTO SUMPS FOR THE ROUTING OF VENT AND STAGE II VAPOR PIPING INTO TURBINE SUMPS AND MAKE CONNECTIONS TO VENT AND CONTRACTOR TO PROVIDE AT LEAST 4 FEET OF PIPING RUN BEFORE A CHANGE OF DIRECTION OF 30 DEGREES OR MORE IN ORDER TO PROVIDE
<br /> DOUBLE WALL VAPOR PIPING FIBERGLASS PIPING. CONTRACTOR TO INSTALL DOUBLE SIDED PENETRATION ENTRY BOOTS FOR ALL ENTRIES INTO SUMPS. CONTRACTOR MECHANICAL FLEXIBILITY PER CODE REQUIREMENTS. CONTRACTOR TO INSTALL TRACER TAPE WITH VAPOR PIPING PER TRENCHING DETAILS
<br /> FRP TANK I.D.="B" TO INSTALL STATIC GROUNDING SYSTEM AT ALL FILL AND VAPOR RISERS PER INSTALLATION DETAILS SHOWN ON SHEET G.0.7. PENETRATIONS INTO ALL SUMPS SHALL BE MADE WITH DOUBLE WALL ENTRY FITTINGS. STAGE II VAPOR RECOVERY PIPING SHALL BE DESIGNED AND DEVELOPMENT INFORMATION:
<br /> INSTALLED FOR 1/4” PER FOOT MINIMUM SLOPE BACK TO TANKS. AT LARGE SITE LAYOUTS, 1/8" PER FOOT MINIMUM IS ACCEPTABLE IF IT AVOIDS � �®
<br /> CONTRACTOR TO INSTALL CARB APPROVED STAGE I MANHOLES WITH 5 GALLON SPILL COLLECTION BUCKETS. INSTALL PRODUCT AND FILL ADAPTERS AND USING A KNOCK OUT SUMP (VAPOR POT) OR HAVING EXCESSIVE TANK DEPTH. CONSULT OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP
<br /> CAPS, SEE ACCOMPANYING DETAILS IN SITE SPECIFIC PLAN SET FOR MANUFACTURER AND INSTALLATION REQUIREMENTS. PROJECT MANAGER, WHERE DISCREPANCIES OCCUR. 3= am/pm
<br /> CONTRACTOR TESTING OF STAGE II VAPOR LINES SHALL BE PERFORMED PRIOR TO BACK FILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. [DUEL, CANOPY
<br /> SEE SITE SPECIFIC DETAIL SHEETS FOR INSTALLATION DETAILS. SEE FIBERGLASS PIPING MANUFACTURER SPECIFICATION BELOW. u"dl ra PD9a
<br /> BEFORE BACK FILL AFTER BACK FILL
<br /> STAGE II PIPING SPECIFICATION:
<br /> TANK INSPECTION AND INSTALLATION - DEFLECTION MEASUREMENT ARCO BRANDED VARIANT: DUAL FILLS AND DUAL STAGE I VAPOR RETURNS ARE TO BE INSTALLED IN CUSTOM MULTIPORT "QUAD" MANHOLE ON THE FIBERCAST SYSTEMS: RED THREAD II PIPE AND FITTINGS (USED FOR SINGLE WALL). WHERE DOUBLE WALL SYSTEMS ARE REQUIRED FOR ALL VENT SITE ADDRESS:
<br /> DIPSTICK PREPARATION 20,000 GALLON TANK ONLY. VENT AND STAGE II TANK CONNECTION AND VENT AND VAPOR PIPING IS INSTALLED IN THE FILL SIDE SUMP PER DETAILS. AND VAPOR PIPING, USE SIZE OVER SIZE RED THREAD II PIPING AND FITTINGS. USE ONLY FIBERCAST SYSTEMS ALCOHOL COMPATIBLE ADHESIVES.
<br /> DRIVE A SMALL HEADED, NON—SPARKING (E.G. BRASS) NAIL HALFWAY INTO A WOODEN DIPSTICK, 1 INCH ALL PIPING AND FITTINGS SHALL BE UL-971 LISTED IN COMPLIANCE WITH THE JULY 2005 PERFORMANCE STANDARDS. ESCALCH AVMUE
<br /> ABOVE ITS BASE. PIPING TO BE INSTALLED PER MANUFACTURER'S LISTED INSTRUCTIONS AND SHALL ONLY BE INSTALLED BY QUALIFIED INSTALLERS CERTIFIED BY THE o KMAY SO
<br /> FIRST DIAMETER READING (PRIOR TO BACK FILL) 6) TURBINE INSTALLATION: MANUFACTURER. PROVIDE AT LEAST 4' OF STRAIGHT PIPING RUN BEFORE A CHANGE OF DIRECTION OF MORE THAN 30 DEGREES AND INSTALL OASO' CA
<br /> 1. PLACE THE DIPSTICK INTO A SERVICE FITTING. STANDARD: CONTRACTOR TO INSTALL FE PETRO IST 2 HP VARIABLE SPEED TURBINES AND PIPING CONNECTION VALVES AND FITTINGS IN TANK FLEXIBLE CONNECTORS AT THE VENT AND VAPOR CONNECTION AT THE TANK SUMPS, AND DISPENSER SUMPS.
<br /> 2. MEASURE AND RECORD THE DISTANCE FROM THE TANK BOTTOM TO THE TOP OF THE FITTING. SUMPS AS SHOWN ON SITE SPECIFIC DETAIL DRAWINGS. ALL PRODUCT LINES TO TURBINES TO BE EQUIPPED WITH 3 GPH ELECTRONIC LINE LEAK
<br /> 3. PULL THE DIPSTICK UP UNTIL THE EXPOSED NAIL CATCHES ON THE INSIDE TOP OF TANK. 0 TBD
<br /> DETECTION. LEAK DETECTORS ARE TO BE TESTED FOR THE 3 GPH LEAK DETECTION PRIOR TO START UP. CONTRACTOR TO PROVIDE TEST DATA AT JURISDICTIONAL VARIANT: INSTALL DOUBLE WALL SIZE OVER SIZE FIBERGLASS PIPING WHEN REQUIRED BY AUTHORITY HAVING JURISDICTION. FACIM
<br /> 4. MEASURE THE DISTANCE FROM THE TANK TOP (INSIDE) TO THE TOP OF THE FITTING. SUBTRACT 1 THE TIME OF PUNCH LIST AS WELL AS INCLUDE IN CLOSE OUT BINDER. ALL TURBINES ARE EQUIPPED WITH STANDARD "R" CHECK VALVE AS A
<br /> INCH FROM THIS MEASUREMENT AND RECORD THE DISTANCE. STANDARD FROM FACTORY. SET TURBINE INTAKES AT 5" FROM BOTTOM OF TANKS. TURBINES TO BE EQUIPPED WITH INTAKE FILTER SCREENS. oESIcsEO BY- AL AwANCE z&nM:
<br /> 5. SUBTRACT THE SECOND DISTANCE FROM THE FIRST AND RECORD THIS VALUE AS READING "A" ON THE CONTRACTOR TO INSTALL 1" RIGID STEEL CONDUITS FOR SUBMERSIBLE PUMP POWER. (ONE FOR EACH TURBINE). CONTRACTOR IS TO LABEL CALIFORNIA VARIANT: STAGE 11 VAPOR PIPING TO BE DOUBLE WALLED AND INSTALLED WITH CONTINUOUS VACUUM MONITORING DEVICE PER AB-2481 CHECKM®Y: BP REM
<br /> INSTALLATION CHECKLIST. TURBINES AND CONTROLLERS AS TO WHICH PRODUCT THEY SERVE. GREEN CONTROLLER LIGHTS ARE TO GO OUT WHEN TURBINES ARE OFF OR REQUIREMENTS. ALL CONNECTIONS TO THE TANKS SHALL BE MADE WITH 3". DRAB ®Y: OV AWANCE PM:
<br /> SECOND DIAMETER READING (AFTER BACKFILL) LOSE POWER. IST PUMP CONTROLS ARE TIED TO VEEDER ROOT TLS-350. SEE APPROPRIATE TURBINE CONFIGURATION AND PROGRAMMING SHEETS. AL
<br /> 1. PLACE THE DIPSTICK INTO A SERVICE FITTING WITH A STANDPIPE INSTALLED TO SUBGRADE. THERE ARE (4) FOUR STAGE 11 EVR WITH ISD DESIGN CHOICES THAT MAY BE INCORPORATED INTO THE UST SYSTEMS IN CALIFORNIA. VEMON: PRMCT Na
<br /> SINGLE MASTER TURBINE CONFIGURATIONS — EQUIPPED AS NOTED ABOVE. SEE APPROPRIATE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS. 1. VEEDER ROOT CARBON CANISTER VAPOR POLISHER WITH VST BALANCE HANGING HARDWARE AND VEEDER ROOT ISD COMPONENTS. °0
<br /> 2. MEASURE AND RECORD THE DISTANCE FROM THE TANK BOTTOM TO THE TOP OF THE STANDPIPE. ��/���� � 17223
<br /> 3. PULL THE DIPSTICK UP UNTIL THE EXPOSED NAIL CATCHES ON THE INSIDE TOP OF TANK. 2. HEALY CLEAN AIR SEPARATOR WITH HEALY VACUUM ASSIST HANGING HARDWARE AND VEEDER ROOT ISD COMPONENTS.
<br /> 4. MEASURE THE DISTANCE FROM THE TANK TOP (INSIDE) TO THE TOP OF THE STANDPIPE. SUBTRACT 1 MASTER—SLAVE TURBINE CONFIGURATIONS — EQUIPPED AS NOTED ,ABOVE EXCEPT: ONLY THE MASTER TURBINE SHALL HAVE THE PLLD LEAK 3. VST ECS VAPOR PROCESSOR WITH VST BALANCE HANGING HARDWARE AND VEEDER ROOT ISD COMPONENTS. DRAWING TITLE:
<br /> INCH FROM THIS MEASUREMENT AND RECORD THE DISTANCE. DETECTOR INSTALLED. CONTRACTOR TO REMOVE THE STANDARD R CHECK VALVE OUT OF THE SLAVE TURBINE. THE BALL VALVE ON MANIFOLD 4. VST BALANCE HANGING HARDWARE WITH FRANKLIN FUELING/HEALY CLEAN AIR SEPARATOR AND VEEDER ROOT ISD COMPONENTS. TA ��� ���� �
<br /> 5. SUBTRACT THE SECOND DISTANCE FROM THE FIRST AND RECORD THIS VALUE AS READING "B" ON THE LINE BETWEEN TURBINES SHALL BE SET IN THE "OPEN" POSITION AND A SINGLE PLLD (PART #848-480-001) IS TO BE INSTALLED ON THE
<br /> INSTALLATION CHECKLIST. MASTER IST WITH AN FE. PETRO NON—VENTED PRECISION CHECK VALVE (PART #65 PSI) INSTALLED ON THE SLAVE IST PREVENTING BACKFILLING SEE GENERAL SHEETS G.0.6 SERIES DRAWINGS FOR DESIGN INTENT DETAILS ON THE ABOVE SYSTEMS. SCOPE OF WOR
<br /> CALCULATION AND COMPARISON OF USTs. SEE APPROPRIATE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS. AND GENERALS NOTES
<br /> 1. SUBTRACT READING SRP FROM READING "A"' MASTER—MASTER TURBINE CONFIGURATIONS — EQUIPPED AS NOTED ABOVE EXCEPT: THE BALL VALVE ON MANIFOLD LINE BETWEEN TURBINES SHALL ( 1 OF )
<br /> 2. COMPARE THIS VALVE TO THE TABLE OF "MAXIMUM ALLOWABLE DEFLECTIONS" SHOWN ON THE BE SET IN THE "CLOSED" POSITION DURING NORMAL OPERATION. SEPARATE LINES & (2) PLLDs (PART #VER-848-480-001) SHALL BE INSTALLED. SHEET NO:
<br /> "INSTALLATION CHECKLIST". IN CASE OF FAILURE OF AN INDIVIDUAL IST, THE PRODUCT CROSS—OVER LINE CAN BE PLACED INTO OPERATION BY OPENING THE CROSS
<br /> 3. VERTICAL DEFLECTION IN EXCESS OF THESE VALUES INDICATES IMPROPER INSTALLATION AND VOIDS THE CONNECTING VALVE. THE FAILED IST MUST HAVE ITS PLLD DISABLED & DISPENSER SIGNAL WIRES NEED TO BE MODIFIED FOR THIS TEMPORARY
<br /> TANK WARRANTY. SET—UP. SEE APPROPRIATE SITE SPECIFIC DRAWINGS FOR INSTALLATION DETAILS. 10A) DECOMMISSIONING STAGE II VAPOR RECOVERY:
<br /> MAXIMUM DEFLECTION FOR 8'-0" TANKS = 1-1/4"
<br /> MAXIMUM DEFLECTION FOR 10'-0" TANKS = 1-1/2" STANDARD: FOR PROJECTS INVOLVING THE DECOMMISSIONING OF STAGE II VAPOR RECOVERY SYSTEMS, G.C. IS TO VERIFY WITH THE AUTHORITY
<br /> HAVING JURISDICTION THAT STAGE II IS NO LONGER REQUIRED AT A SPECIFIC FACILITY BEFORE INITIATING THE DECOMMISSIONING WORK AND WHICH G5,0,,2El
<br /> DECOMMISSIONING PROCEDURES ARE REQUIRED TO BE IMPLEMENTED. SEE SHEET G.0.6.15. FOR GENERAL REQUIREMENTS AND PROCEDURES.
<br /> CONSULT OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER, WHERE DISCREPANCIES OCCUR BETWEEN THE CONTRACT
<br /> DOCUMENTS AND THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION.