Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer D Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br /> Test Equipment Used: Incon Tester <br /> Sump/UDC ID 87 STP 91 STP Diesel STP <br /> Sump Manufacturer Fiberglass Fiberglass Fiberglass <br /> Sump Depth (inches) 64" 649' 64" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 24" 24" 22" <br /> (inches) <br /> Test Start Time 10:44 am 10:25 am 10:25 am <br /> Initial Reading 4.9772 5.1354 5.8235 <br /> Test End Time 10:59 am 10:40 am 10:40 am <br /> Final Reading 4.9778 5.1351 5.8235 <br /> Change in Reading 0.0006 0.0003 0.0000 <br /> Pass/Fail Criteria 0.002 0.002 0.002 <br /> Tightness Test Results p Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID 87 FILL 91 FILL Diesel FILL <br /> Sump Manufacturer Fiberglass Fiberglass Fiberglass <br /> Sump Depth (inches) 649' 649' 649' <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration N/A N/A N/A <br /> (inches) <br /> Test Start Time 8:56 am 8:56 am 8:56 am <br /> Initial Reading 3.8239 5.8817 3.2207 <br /> Test End Time 9:11 am 9:11 am 9:11 am <br /> Final Reading 3.8227 5.8813 3.2201 <br /> Change in Reading 0.0012 0.0004 0.0006 <br /> Pass/Fail Criteria 0.002 0.002 0.002 <br /> Tightness Test Results 0 Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />