My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 11:27:43 AM
Creation date
1/13/2023 9:04:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SPEEDWAY) #68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer D Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br /> Test Equipment Used: Incon Tester <br /> Sump/UDC ID UDC 1/2 UDC 3/4 UDC 5/6 UDC 7/8 <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) 12" 12" 12" 12" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 4" 4" 4'9 4" <br /> (inches) <br /> Test Start Time 12:43 pm 12:43 pm 12:43 pm 12:43 pm <br /> Initial Reading 1.9887 1.0973 1.6558 1.8961 <br /> Test End Time 12:58 pm 12:58 pm 12:58 pm 12:58 pm <br /> Final Reading 1.9884 1.0968 1.6555 1.8960 <br /> Change in Reading 0.0003 0.0005 0.0003 0.0001 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results 0 Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.