My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 11:27:43 AM
Creation date
1/13/2023 9:04:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SPEEDWAY) #68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> S. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure 0 Vacuum ❑ Hydrostatic <br /> Test Equipment Used , vacuum guage <br /> Tank ID 87 - 01 -� Diesel <br /> Tank Manufacturer Owens Coming Owens Coming Owens Corning <br /> Tank Capacity 10 ow _ 10, E �a� oao <br /> Test Start Time 10:46 am 11 :00 am 11 :50 am <br /> Initial Reading 10 hg 10 hg 10 hg <br /> Test End Time 11 :46 am 12:00 pm 12:30 pm <br /> Final Reading 10 hg 10 hg 10 hg <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria o 0 0 _ <br /> Tightness Test Results 0 Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail � ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> Test Type 0 Pressure ❑ Vacuum [3 Hydrostatic <br /> Test Equipment Used : Pressure guage <br /> Pipe `Run ID 97 g1 -- Diesel <br /> Pipe Manufacturer Smith Smith Smith <br /> Test Start Time 10:30 am 10:30 am 10:30 am <br /> _ - _ . <br /> Initial Reading 3 pal ? 3 pal 3 psi <br /> Test End Time 11 :30 am 11 :30 am 11 :30 am <br /> Final Reading 3 pal 3 poi - 3 pal <br /> Change in Readingo o o <br /> - - - - - -- <br /> Pass/Fail Criteria o o 0 <br /> Tightness Test Results 0 Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fall ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer -- <br /> Test Start Time <br /> - - - - --- - ---- <br /> Initial Reading - - - - <br /> Test End Time <br /> - <br /> Final Reading -- - - -- -- - - - <br /> Change in Reading <br /> Pass/FaiE Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail 0 Pass ❑F WN <br /> Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail" and any repairs made befom or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.