My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:44:35 PM
Creation date
1/13/2023 9:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518288
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3250 W GRANT LINE RD TRACY 95377
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Was there an overall end of project work order submitted for the tank installation and upgrade completion? For <br /> the request for the work order for 9/14/2022, 1 noticed what was sent 1/26/2022 was actually a work order with <br /> a trip date of 9/13/2022. Was Bruno's email a typo on the date stating that a technician came out and verified <br /> drop tubes were correct measurements on 9/14/2022 and he actually meant to say 9/13/2022? <br /> a. Attached are emails and work orders from Jones Covey Group. Please confirm if you need any additional <br /> information to resolve this violation. <br /> Jennifer Manning I Project Coordinator I Certified Class A/B Operator <br /> Office:425-251-6222 1 Direct:425-656-7440 <br /> Barghausen Consulting Engineers, Inc. <br /> 1821572 n'Avenue South, Kent, WA 98032 <br /> www.barvhausen.com <br /> From: Presto, Carol [EHD] <cpresto@sjgov.org> <br /> Sent: Wednesday, February 22, 2023 3:58 PM <br /> To:Jennifer Manning<jmanning@Barghausen.com> <br /> Cc:Jay Grubb<jgrubb@barghausen.com>; Alexia Inigues<ainigues@barghausen.com>; Chealsea Biggs <br /> <cbiggs@barghausen.com>; Steven Nelson <snelson@barghausen.com>; Silvia Gonzalez<sgonzalez@barghausen.com>; <br /> Jamie Stewart<jastewart@costco.com>; Ray<rgallagher@costco.com> <br /> Subject: RE: CA-Costco Gasoline Tracy 658/ NOV for CERS ID 10146285 - Expansion/BCE#10050.11a <br /> Hi Jennifer, <br /> #111—There were no emails attached regarding fuel drop requests.The email from Jones Covey attached discusses no <br /> individual work orders available for 6/6/2022-9/2/2022. Please review the inspection report. #111 discusses overfill <br /> test results dated 8/26/2022 that were submitted to EHD. #111 does not discuss anything regarding fuel drop requests. <br /> In addition you state that no testing was conducted that day, 8/26/2022,yet EHD received test results for 8/26/2022 for <br /> overfill testing.These overfill test results for 8/26/2022 were also included in the previously submitted return to <br /> compliance packet. EHD was not notified of any overfill testing that was scheduled for 8/26/2022. We were notified of <br /> the 8/30/2022 overfill testing and were on site.The email correspondence from your previous packet shows a request to <br /> schedule testing 8/30/2022 -8/31/2022 (which included overfill) and ELD on 8/25/2022. Review details in the inspection <br /> report amended 12/29/2022 and corrective actions required. <br /> #115—closed based on statement <br /> #203— <br /> 1. The attached is not an alarm history and if the panel was replaced same day 6/6/2022 then you should have had <br /> a working panel 6/6/2022 through project completion.The document submitted shows a time period before the <br /> panel was replaced. We need it after it was replaced throughout the duration of the installation and upgrade <br /> construction project. <br /> 2. See the inspection appointments on the temporary closure permit.The tanks did not go through any of the <br /> inspections listed on the temporary closure.The temporary closure permit was approved in case Costco decided <br /> to temporarily close the tanks during the project so Costco already had a permit in place but the tanks were not <br /> temporarily closed.To be temporarily closed the product needs to be removed and product was kept in the <br /> tanks. <br /> 3. The attached work order with the Order Date of 9/30/2022 does not reference at all a technician coming out <br /> and determining the drop tube to be faulty. It only references that drop tubes were installed 10/10/2022 on the <br /> Tank 2 87B tank. Bruno Espinoza's email from 11/4/2022 stated that a technician came out on 9/27/2022 to <br /> inspect the tubes and determined faulty. Do technicians typically not leave work orders on site when they do <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.