Laserfiche WebLink
Presto, Carol [EHD] <br /> From: Presto, Carol [EHD] <br /> Sent: Wednesday, March 29, 2023 10:07 AM <br /> To: Jennifer Manning <br /> Cc: Jay Grubb;Alexia Inigues; Chealsea Biggs; Steven Nelson; Silvia Gonzalez <br /> Subject: RE: CA- Costco Gasoline Tracy 658/NOV for CERS ID 10146285 - Expansion/BCE# <br /> 10050.11 a <br /> Good Morning Jennifer, <br /> Please see notes below. <br /> Item#111—closed <br /> Item#203—this is one violation with 5 different items requested.Only 2 out of the 5 items below have a statement <br /> that CCR2712(b)(1-2)will be met in the future. Items 3-4 doesn't have that statement. Does that statement apply to <br /> all items that were being requested for this violation or only for those items it was listed under? I can mark 1 and 2 as <br /> acceptable based on the statements and 5 as acceptable based on the provided work order. But since the statements <br /> are only listed under 1 and 2,we still don't have enough information for 3 and 4. <br /> 1. AIGFM h�stery print outfer-Gil G!Gr-.m-q th-at-o-e-e-urred qfter-june 2022 designGted epeFGter-report until thtZ <br /> the F nG!testing a .-ed 9/2/1/' 022 <br /> G. in thefutur"i the GGR 2712(b)(1 71 r ntS 141111 6.. get <br /> • Acceptable statement for requested item <br /> 2. Alarm logs and response records for all alarms that occurred during the 91 tank installation and fueling station <br /> upgrade. This means responses to each alarm that occurred and that they were responded to as the tank was not <br /> temporarily closed during the renovations, so the UST should have been continued to be monitored during this <br /> whole renovation. <br /> a. Please seethe attached alarm logs from the facility for alarms that occurred during the 91 tank <br /> installation and fueling station upgrade with responses provided by Jones Covey Group. In the future, the <br /> CCR 2712(b)(1-2)requirements will be met. <br /> i. Alarms from 8/31:Generated during system startup and calibration <br /> ii. Alarms from 8/30:Generated during the Monitoring Certification <br /> iii. Alarms from 8/29:Generated during the Monitoring Certification pre-testing <br /> iv. Alarms from 8/28:Generated during Monitoring Certification pre-testing <br /> v. Alarms from 8/27:Generated during continued dry-monitoring certification <br /> • As previously stated, we need alarm logs for the duration of the project.The project took place from <br /> June 2022 through August 2022.The attached document titled Site Alarm Details only has a date range <br /> of 8/25/2022-9/1/2022. It's possible that there weren't any alarms prior to this date range, but the <br /> document shows only from this timeframe in August to the first of September. <br /> • In addition several of the alarms in the Site Alarm Details were not addressed in statements i-v above. <br /> These don't address what the reason or what was done of the alarm. <br /> Alarm Alarm Alarm Alarm Device Alarm Alarm Alarm Comment <br /> Number Status Category Type Time FMS Time Clear <br /> Time <br /> 1 <br />