My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:44:35 PM
Creation date
1/13/2023 9:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518288
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3250 W GRANT LINE RD TRACY 95377
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
222229183 Alarm Pressure PLLD 03— 8/25/2022 8/25/2022 8/29/2022 PLLD <br /> Cleared/ Line Shutdown UNLEADED 2:49:00 5:54:24 2:52:00 Shutdown <br /> Closed Leak Alarm 87C PM PM PM Alarm, <br /> Test <br /> 222231991 Alarm Smart Sensor 22 8/25/2022 8/25/2022 8/25/2022 Sensor <br /> Cleared/ Sensor High 2:55:00 7:06:47 3:12:00 High <br /> Closed Alarm Liquid PM PM PM Liquid <br /> Alarm Alarm, <br /> Polled <br /> Alarm <br /> 222231993 Alarm Smart Sensor 22 8/25/2022 8/25/2022 8/25/2022 Sensor <br /> Cleared/ Sensor High 3:15:00 7:06:48 3:15:00 High <br /> Closed Alarm Liquid PM PM PM Liquid <br /> Alarm Alarm, <br /> Polled <br /> Alarm <br /> 222238389 Alarm Tank Tank 05 - 8/25/2022 8/25/2022 8/25/2022 Tank <br /> Cleared/ Alarm Probe PREMIUM 5:30:00 9:39:47 5:34:00 Probe <br /> Closed Out PM PM PM Out <br /> Alarm Alarm, <br /> Polled <br /> Alarm <br /> 222274335 Alarm Pressure PLLD 01— 8/26/2022 8/26/2022 8/27/2022 PLLD <br /> Cleared/ Line Shutdown UNLEADED 12:00:00 7:48:52 11:16:00 Shutdown <br /> Closed Leak Alarm 87A AM AM AM Alarm, <br /> Test <br /> 22274337 Alarm Pressure PLLD 02— 8/26/2022 8/26/2022 8/28/2022 PLLD <br /> Cleared/ Line Shutdown UNLEADED 12:00:00 7:48:52 12:41:00 Shutdown <br /> Closed Leak Alarm 87B AM AM PM Alarm, <br /> Test <br /> 22274339 Alarm Pressure PLLD 04—GAS 8/26/2022 8/26/2022 8/31/2022 PLLD <br /> Cleared/ Line Shutdown ADDITIVE 12:00:00 7:48:53 3:36:00 Shutdown <br /> Closed Leak Alarm AM AM PM Alarm, <br /> Test <br /> 222274341 Alarm Pressure PLLD 05— 8/26/2022 8/26/2022 8/28/2022 PLLD <br /> Cleared/ Line Shutdown PREMIUM 12:00:00 7:48:53 1:35:00 Shutdown <br /> Closed Leak Alarm AM AM PM Alarm, <br /> Test <br /> 3. The attached work order with the Order Date of 9/30/2022 does not reference at all a technician coming out and <br /> determining the drop tube to be faulty. It only references that drop tubes were installed 10/10/2022 on the Tank <br /> 2 87B tank. Bruno Espinoza's email from 11/4/2022 stated that a technician came out on 9/27/2022 to inspect <br /> the tubes and determined faulty. Do technicians typically not leave work orders on site when they do inspections <br /> on your system? We typically see work orders on site at facilities even for inspecting a UST component and not <br /> doing any work that day. How was the site notified of the faulty drop tube?How are you keeping records of <br /> issues with the UST system if technicians don't leave work orders? <br /> a. Attached are emails and work orders from Jones Covey Group. Please confirm if you need any additional <br /> information to resolve this violation. <br /> • The attached work order(Job Order Field 2256026-1)with the Order Date of 9/30/2022 still does not <br /> reflect any technicians determining the drop tube to be faulty.This work order just stated that the T2 <br /> overfill flapper was faulty and new T2 drop tube was installed on 10/10/2022. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.