My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:44:35 PM
Creation date
1/13/2023 9:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518288
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3250 W GRANT LINE RD TRACY 95377
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is the Overfill Prevention Device: <br />-rnrMAN; s'hUIUrr <br />LE4F1 Ror DESEL <br />F .e4 <br />12QWAAY SNuroDFF <br />s 30 LPM <br />Va .ul" out rw <br />SFR91)FF LEVEL <br />VWRbI" Cirt WWr <br />PER M:STRLICT"JS i9; <br />FLOW RATE AREA <br />127 mm <br />pos'"'rtSWT°`K <br />(5 in) <br />< 4 LPM <br />143 mm <br />WACIN a" OPV: <br />(5.6 in) <br />- F9C0IER FLOIYAATE <br />PRIMARY SHJJTOF <br />lF£EL for GAS <br />-rnrMAN; s'hUIUrr <br />LE4F1 Ror DESEL <br />F .e4 <br />12QWAAY SNuroDFF <br />s 30 LPM <br />Va .ul" out rw <br />VWRbI" Cirt WWr <br />2fCFSEASE le krd <br />uctrsssr 1112 iCE11 n1 <br />PRIMARY SKUTOFF of <br />2RIM RY SlNrOFF d N, <br />M"haw-W ON: <br />WACIN a" OPV: <br />• LOWER FLOWRATE <br />- F9C0IER FLOIYAATE <br />• H90HER SPECRIC GRAVRY <br />- LOWER SMC94C GRAVRY <br />. SMALLER OLCWTER TAW <br />-LARGER DtVETER TAN[ <br />INSTALLATION <br />INSTALLING THE OPV <br />A WARNING: If you are working with drop tubes that have been exposed to fuel or other <br />flammable substances, allow these substances and any vapors to dissipate in a well -ventilated <br />area for an hour before you perform any procedures. <br />Required equipment: <br />• Tape measure <br />• Half round file <br />• Permanent marker <br />• FFS pipe cutter* or metal saw <br />• Groove roller tool* <br />• OPV assembly <br />• 4" upper drop tube gasket <br />• Hose clamp <br />• Warning plate <br />* Refer to the FFS catalog for ordering information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.