My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:44:35 PM
Creation date
1/13/2023 9:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518288
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3250 W GRANT LINE RD TRACY 95377
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04, T+4 <br />K <br />$14' law <br />$II Tom <br />NOTE: When secondary, "positive," shut-off is set at 95% of tank volume, the level at which <br />primary shut-off occurs varies with tank volume. The above illustration depicts how tank volume <br />could influence the actual shut-off levels of a mechanical OPV. <br />9R -V% <br />9&0% <br />971% <br />95.0% <br />WAN <br />= glow <br />97.a% <br />i <br />9L0% <br />T01% <br />e91% <br />6!0% <br />671% <br />1160% <br />854" <br />-- <br />— — — —-- <br />----- <br />---- r-- <br />----41- <br />1 —A' <br />! <br />INSTALLED X98% <br />! <br />I <br />! <br />PRITH <br />FINAIMARY LSHUTOFF <br />INSTWD @98% <br />'A" <br />INSTALLED X95% <br />--- <br />----*-- <br />----�-- <br />_. FI NAL$HVTOFF <br />E-- <br />! <br />INSTALLED X98% <br />! <br />I <br />! <br />PRITH <br />FINAIMARY LSHUTOFF <br />INSTWD @98% <br />FINALSHUTOFF <br />INSTALLED X95% <br />PRi MARYSHUTOFF <br />WITH FINAL <br />INSTALED 095% <br />A'tSVM?TIONS; <br />{GENERIC CYUN DWCAL <br />TANK WRH FLAT ENDS <br />-PRIMARY SHUTOFF <br />POINT IS A <br />CALCULATED OFFSET <br />(5"1 FROM FINAL <br />SHUTOFF $MOINT, <br />USING GASOLINE WITH <br />A SPECIFIC GRAVDY OF <br />M75 <br />gyOK I I i I <br />3 4 5 G 7 S 9 10 U 12 13 14 <br />TANK DIM ET E R (FEETI <br />NOTE: The installation height of an OPV can be adjusted to optimize actual shut-off levels as <br />required. Consult local regulations for specific requirements in your area. The above graph <br />shows how a two-stage, mechanical overfill prevention device is influenced by tank diameter and <br />volume. <br />
The URL can be used to link to this page
Your browser does not support the video tag.