My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:44:35 PM
Creation date
1/13/2023 9:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518288
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3250 W GRANT LINE RD TRACY 95377
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Witness lines or marks <br />Second groove <br />COMPLETE THE INSTALLATION <br />Before you install the OPV, remove any burrs and clean the inside of the tank riser pipe properly. <br />If you do not, the OPV might be damaged or unable to function properly. <br />NOTE: The upper and lower threads of the drop tube adapters are lubricated at the factory. <br />Do not use pipe sealant. Make sure the 0 -rings on both ends of the OPV are present and <br />undamaged. <br />1. Check the float and flapper mechanism by rotating the outer coupler counter -clockwise. <br />Make sure this activates the internal flapper and operates smoothly. <br />Outer coupler <br />2. Make sure the drop tube gasket is installed under the upper drop tube flange. (See step 3 of <br />"Install the upper drop tube adapter.") <br />3. Thread the upper and lower drop tubes onto the OPV, and then use strap wrenches (not <br />pipe wrenches) to tighten the drop tubes. Position one on the upper drop tube, and the <br />other on the lower drop tube. Do not tighten the float shield or valve. <br />
The URL can be used to link to this page
Your browser does not support the video tag.