Laserfiche WebLink
Do not use wrenches in this area. <br />4. Spill containment must be grounded to earth to discharge any static electricity. <br />5. Carefully lower the completed OPV assembly into the riser pipe. <br />Do not drop the assembly or force it down the riser pipe. If it does not fit, clean the riser <br />pipe, and attempt to insert the OPV assembly again. If it still does not fit, the riser pipe may <br />need to be replaced. <br />6. Reinstall the spill bucket components. <br />Use the stainless steel band clamp to install the warning plate around the 4" (102 mm) riser <br />pipe below the threaded section. <br />8. Perform the operational inspection procedure. <br />12 <br />�r- <br />