Laserfiche WebLink
PEIIRP1200-12 <br />alarm devices must automatically restrict flow or alert <br />the transfer operator when the tank is no more than <br />90 percent full. This approach reflects the more conserva- <br />tive application of the rules. <br />7.1 Automatic Shutoff Devices. <br />7.1.1 General. Automatic shutoff devices, <br />sometimes called flappers or flapper valves, arc <br />an integral part of the drop tube assembly installed <br />within the tank fill riser. They are designed to <br />initially restrict and subsequently completely shut <br />off flow when product has reached predetermined <br />levels during a delivery. Automatic shutoff valves <br />need to be properly positioned and operate freely to <br />control flow and prevent tank overfills. <br />7.1,2 Purpose. The purpose of this inspection <br />is to verify the automatic shutoff valve is installed <br />properly, operates as designed and is set to com- <br />pletely shut oft flow when the tank is no more than <br />95 percent full. <br />7.1.3 Description of Inspection. After a pre- <br />liminary inspection of the automatic shutoff instal- <br />lation, the drop tube is removed from the tank. The <br />automatic shutoff is checked for proper operation, <br />and its placement is measured to verify that it is <br />properly located to completely shut off flow when <br />the tank is no more than 95 percent full. <br />7.1.4 Preparation. Refer to the tank manufac- <br />turer's calibration chart for the capacity in gal- <br />lons, the diameter and the volume of product with <br />respect to product level. <br />If the automatic shutoff device has a float that <br />extends from the drop tube in the shutoff (closed) <br />position, verify the proper orientation of the float <br />mechanism. The float mechanism should be orient- <br />ed away from any obstructions (ball float, submers- <br />ible turbine pump (STP), tank wait, tank gauge <br />probe, etc.) If the movement of the float mecha- <br />nism is restricted, it will not function as designed. <br />Use this procedure in conjunction with the manu- <br />facturer's installation and maintenance instructions. <br />7.1.5 Inspection Equipment. Test equipment <br />shall include: <br />• tools for removal of the drop tube; <br />• tape measure; <br />• tools for inspection of the automatic shutoff. <br />0 pei.org <br />7.1.6 Inspection Procedure. <br />1. Remove the drop tube from the tank. <br />2. Visually inspect the automatic shutoff valve and <br />float mechanism for any damage and remove <br />any debris or foreign objects. <br />3. Manually move the float mechanism to ensure it <br />moves freely. <br />4. With the float mechanism in the shutoff (closed) <br />position, visually inspect the drop tube and <br />verify that the shutoff valve is released and will <br />move into the product flow path. <br />5. If possible, verify that the bypass valve in the <br />drop tube is open and free of blockage. <br />6. If problems with the shutoff valve are found and <br />defective components need repair or replace- <br />ment, notify the appropriate person. <br />7. Using the automatic shutoff device manufac- <br />turer's suggested procedure, examine the drop <br />tube and shutoff valve to determine if product <br />flow will be completely shut off at 95 percent of <br />tank capacity. Make any adjustments necessary <br />to ensure that flow will be completely shut off <br />when the tank is no more than 95 percent full. <br />FIGURE 7-1. Check the drop tube and flapper for dam- <br />age. Make sure that the flapper moves freely and shuts <br />off flow when extended. <br />S. After inspection of the automatic shutoff device, <br />reinstall the drop tube. <br />7.1.7 Pass/Pail Criteria. If the automatic shut- <br />off device functions as designed and complete <br />shutoff of product flow is able to occur when the <br />