My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:44:35 PM
Creation date
1/13/2023 9:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518288
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3250 W GRANT LINE RD TRACY 95377
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEIIRP1200-12 <br />alarm devices must automatically restrict flow or alert <br />the transfer operator when the tank is no more than <br />90 percent full. This approach reflects the more conserva- <br />tive application of the rules. <br />7.1 Automatic Shutoff Devices. <br />7.1.1 General. Automatic shutoff devices, <br />sometimes called flappers or flapper valves, arc <br />an integral part of the drop tube assembly installed <br />within the tank fill riser. They are designed to <br />initially restrict and subsequently completely shut <br />off flow when product has reached predetermined <br />levels during a delivery. Automatic shutoff valves <br />need to be properly positioned and operate freely to <br />control flow and prevent tank overfills. <br />7.1,2 Purpose. The purpose of this inspection <br />is to verify the automatic shutoff valve is installed <br />properly, operates as designed and is set to com- <br />pletely shut oft flow when the tank is no more than <br />95 percent full. <br />7.1.3 Description of Inspection. After a pre- <br />liminary inspection of the automatic shutoff instal- <br />lation, the drop tube is removed from the tank. The <br />automatic shutoff is checked for proper operation, <br />and its placement is measured to verify that it is <br />properly located to completely shut off flow when <br />the tank is no more than 95 percent full. <br />7.1.4 Preparation. Refer to the tank manufac- <br />turer's calibration chart for the capacity in gal- <br />lons, the diameter and the volume of product with <br />respect to product level. <br />If the automatic shutoff device has a float that <br />extends from the drop tube in the shutoff (closed) <br />position, verify the proper orientation of the float <br />mechanism. The float mechanism should be orient- <br />ed away from any obstructions (ball float, submers- <br />ible turbine pump (STP), tank wait, tank gauge <br />probe, etc.) If the movement of the float mecha- <br />nism is restricted, it will not function as designed. <br />Use this procedure in conjunction with the manu- <br />facturer's installation and maintenance instructions. <br />7.1.5 Inspection Equipment. Test equipment <br />shall include: <br />• tools for removal of the drop tube; <br />• tape measure; <br />• tools for inspection of the automatic shutoff. <br />0 pei.org <br />7.1.6 Inspection Procedure. <br />1. Remove the drop tube from the tank. <br />2. Visually inspect the automatic shutoff valve and <br />float mechanism for any damage and remove <br />any debris or foreign objects. <br />3. Manually move the float mechanism to ensure it <br />moves freely. <br />4. With the float mechanism in the shutoff (closed) <br />position, visually inspect the drop tube and <br />verify that the shutoff valve is released and will <br />move into the product flow path. <br />5. If possible, verify that the bypass valve in the <br />drop tube is open and free of blockage. <br />6. If problems with the shutoff valve are found and <br />defective components need repair or replace- <br />ment, notify the appropriate person. <br />7. Using the automatic shutoff device manufac- <br />turer's suggested procedure, examine the drop <br />tube and shutoff valve to determine if product <br />flow will be completely shut off at 95 percent of <br />tank capacity. Make any adjustments necessary <br />to ensure that flow will be completely shut off <br />when the tank is no more than 95 percent full. <br />FIGURE 7-1. Check the drop tube and flapper for dam- <br />age. Make sure that the flapper moves freely and shuts <br />off flow when extended. <br />S. After inspection of the automatic shutoff device, <br />reinstall the drop tube. <br />7.1.7 Pass/Pail Criteria. If the automatic shut- <br />off device functions as designed and complete <br />shutoff of product flow is able to occur when the <br />
The URL can be used to link to this page
Your browser does not support the video tag.