My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:44:35 PM
Creation date
1/13/2023 9:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518288
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3250 W GRANT LINE RD TRACY 95377
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities <br />tank is no more than 95 percent full, the automatic <br />shutoff device passes the inspection. <br />If the automatic shutoff device does not function <br />as designed or complete shutoff of product flow <br />is unable to occur until the tank is more than 95 <br />percent full, the automatic shutoff device fails the <br />inspection. <br />7.2 Ball Float Vales. The PEI Overfill, Release <br />Detection and Release Prevention Equipment Testing <br />Committee recommends that ball floats be removed from <br />USTs as overfill prevention devices and another method <br />of overfill prevention be installed. <br />7.2.1 General. Ball float valves are designed <br />to restrict product flow when product in the tank <br />reaches a certain level by restricting vapor flow <br />from the tank ullage. When vapor flow is restricted, <br />pressure builds in the tank ullage, slowing the flow <br />of product into the tank. <br />To operate properly, the ball float valve must be <br />properly installed, positioned at the correct height <br />inside the tank and compatible with UST configu- <br />ration. <br />7.2.2 Purpose. The purpose of this inspection is <br />to verify that the ball float valve is installed prop- <br />erly, operates as designed, and is set to restrict flow <br />when the tank is no more than 90 percent full. <br />FIGURE 7-2. Ball float assembly showing the ball in the <br />open position. The ball will float and cover the vapor <br />path if the product rises above the level of the cage. <br />7.2.3 Inspection Equipment. Test equipment <br />shall include: <br />• equipment to remove the vent restriction device; <br />• tape measure. <br />7.2.4 Description of Inspection. The ball float <br />valve assembly is removed from the tank, inspect- <br />ed for proper operation and measured to ensure that <br />the ball float assembly is the proper dimension to <br />restrict flow into the tank when it is no more than <br />90 percent full. <br />7.2,5 Preparation. Refer to the manufacturer's <br />tank chart for the capacity in gallons, the diameter <br />and the volume of product with respect to product <br />level. <br />Use this test procedure in conjunction with the man- <br />ufacturer's installation and maintenance instruc- <br />tions. <br />Visually verify that all tank -tap fittings are leak - <br />free and vapor -tight before starting the test proce- <br />dure. If any fittings arc loose, the ball float valve <br />will not restrict flow. <br />Inspect the drop tube to ensure that it does not have <br />an overfill valve. <br />7.2.6 Inspection Procedure. <br />1. Remove the ball float valve assembly from the <br />tank. <br />2. Visually inspect the ball float and cage. Remove <br />any debris or foreign objects. <br />FIGURE 7-3. To avoid damage when removing or rein- <br />stalling the ball float, use an extractor tool recommend- <br />ed by the bail float manufacturer. <br />peLorg <br />
The URL can be used to link to this page
Your browser does not support the video tag.