My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 10:29:54 AM
Creation date
1/25/2023 9:27:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PE URP1200 -12 <br /> there are items that must be repaired or replaced 6 . 5. 6 Test Procedure. <br /> (e. g . , deteriorated penetration fitting boots) , 1. Begin the test by adding water to the sump to a <br /> notify the owner/operator and obtain approval minimum of 4 inches above the highest sump <br /> prior to proceeding with repairs . penetration or sump sidewall seam, whichever is <br /> 4 . Test boots or secondary containment tegmina- higher. To compensate for sump deflection, the <br /> tion fittings must be present on the piping pen- water must be allowed to settle a minimum of <br /> etrating the sump . During testing, these fittings 15 minutes before taking the initial test measure- <br /> prevent water from entering the interstitial space ment. If the highest sump penetration or sump <br /> of double-walled piping. Without these fittings , sidewall seam is less than 4 inches from the top <br /> the integrity of the sump cannot be tested using of the sump, add water to within 1 inch of the <br /> this method . top of the sump. <br /> 5 . If interstitial monitoring sensors are present 2. Place the measuring stick vertically at the lowest <br /> within the containment sumps , temporarily point in the sump and extending above the water <br /> remove them before conducting the test. If the level in the sump to allow for an accurate mea- <br /> sensor is removed , reposition after testing to surement to be taken . The location of the mea- <br /> appropriate position according to the manufac- suring stick must remain the same for each water <br /> turer ' s instructions . level measurement. Document the initial water <br /> level measurement as measured from the bottom <br /> 6 . If the containment sump is found to have cracks , of the sump. Alternative measurement methods <br /> loose parts or separation of any joints at penetra- may be used provided that the measurement to <br /> tion fittings , it is not considered to be liquid- <br /> tight. This visually indicates a test failure. 1 /16 (0.063) inch can be made. <br /> 3 . Take all precautions to prevent the water level <br /> CAUTI® N• Water can damage electrical from being disturbed during the duration of the <br /> connections. Ensure that there are no test, <br /> components that can be damaged by the 4 . After 1 hour, document the ending water level <br /> addition of water to the sump. If such measurement, <br /> components are present, take appropriate S. Upon completion of the test: <br /> precautions when performing the test or <br /> use an alternative test method . remove all water and properly dispose of it <br /> according to Section 6. 7 ; <br /> • reinstall any interstitial monitoring sensors in <br /> their proper positions ; <br /> • return the test boots or secondary contain- <br /> "'`"'``' - meat fittings to their pre- test operating con- <br /> figurations ; <br /> Water Electrical <br /> Level Junction <br /> l Box <br /> Electrical <br /> Conduit <br /> Water <br /> Product Level <br /> Plping <br /> Electrical <br /> Conduit <br /> pm <br /> Product <br /> FIGURE 6-5. The test fluid level in the UDC must be at PlPlne <br /> least 4 Inches above the highest sump penetration or <br /> sidewall seam . <br /> FIGURE 6-6 . To prevent leakage, check all penetration <br /> fittings before adding water to ensure they make a tight <br /> seal. <br /> pei .org <br />
The URL can be used to link to this page
Your browser does not support the video tag.