My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
120
>
2300 - Underground Storage Tank Program
>
PR0515365
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 2:39:50 PM
Creation date
1/27/2023 9:38:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0515365
PE
2361
FACILITY_ID
FA0012107
FACILITY_NAME
A TEICHERT & SON INC*
STREET_NUMBER
120
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342006
CURRENT_STATUS
01
SITE_LOCATION
120 FRANK WEST CIR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by 0 Manufacturer 0 Industry Standard © Professional Engineer <br /> Test Type 0 Pressure 0 Vacuum Hydrostatic <br /> Test Equipment Used: <br /> Tank ID 87 Diesel Waste Oil <br /> Tank Manufacturer Xerxes Xerxes Xerxes <br /> Tank Capacity 15K 35K 2K <br /> Test Start Time 10:10 10:15 13:50 <br /> Initial Reading -10 Hg -10 Hg -10 Hg <br /> Test End Time 11:10 12:15 14:50 <br /> Final Reading -10 Hg -10 Hg -10 Hg <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria +/-0 +/-0 +/-0 <br /> 11 Tightness Test Results 0 Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by 0 Manufacturer 0 Industry Standard 0 Professional Engineer <br /> Test Type 0 Pressure 0 Vacuum 0 Hydrostatic <br /> Test Equipment Used: Pressure Guage <br /> Pipe Run ID 87 Line Diesel Loader Line Diesel Disp Line Loader Hose Line <br /> Pipe Manufacturer Smith Smith Smith Unknown <br /> Test Start Time 10:15 10:43 10:20 10:23 <br /> Initial Reading 5 Psig 5 Psig 5 Psig 5Psig <br /> Test End Time 11:15 11:43 11:20 11:23 <br /> Final Reading 5 Psig 5 Psig 5 Psig 5 Psig <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria +/-0 +/-0 +/-0 <br /> Tightness Test Results 0 Pass 0 Fail E Pass ® Fail I Ej Pass 0 Fail 0 Pass 0 Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results 0 Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.