My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
816
>
2300 - Underground Storage Tank Program
>
PR0231470
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 3:49:27 PM
Creation date
2/8/2023 1:25:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231470
PE
2361
FACILITY_ID
FA0003911
FACILITY_NAME
VAN DE POL ENTERPRISES INC
STREET_NUMBER
816
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102010
CURRENT_STATUS
01
SITE_LOCATION
816 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> s• TANK SECONDARY CONTAINMENT�TES�� <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional <br /> Test Type ssional Engineer <br /> Test Equipment Used: Vacuum PUMP/Vacuum a acuum <br /> Hydrostatic <br /> ID <br /> Tank ages in Hg. LJ <br /> Tank Manufacturer 1-87191 2-Diesel <br /> Joor Joor <br /> Tank Capacity 10K 2 Compt. 12K <br /> Test Stark Time 11:45 <br /> Initial Reading 11:55 <br /> Test End Time -6 Hg.12:45 12:55 <br /> -6" Hg. <br /> Final Reading -6" H <br /> g• -6" Hg. <br /> Change in Reading 0" Hg. rig <br /> Pass/Fail Criteria No Loss <br /> Tinht—ccTo No Loss <br /> .�.......,.., �t Rltg 141 Dr. <br /> c.y uovov El Fail Iq D000 r1 Foil <br /> 7. PIPES uvv un n D.�oo n D. H n D- <br /> ECONDARY CONTAINMENT TEST u uvv u n Fait <br /> �-- uvv u . un <br /> Test Method Developed by ❑ Manufacturer N Ind <br /> Test Type ustry Standard Professionalacuuru Engineer <br /> Test Equipment Used: Pressure Gauges in Psi❑/N t ogen LJ Hydrostatic <br /> Pine Run ID 187 Product Vent <br /> Pipe - <br /> Manufacturer 2'87 V 3-91 Product <br /> Smith Smith 4-91-Vent <br /> Test Start Time Smith Smith <br /> 11:48 11:30 11:51 <br /> Initial Reading 5 Psi 11:33 <br /> Test End Time 5 Psi 5 Psi <br /> 12:48 12:30 5 Psi <br /> Final Reading 5 Psi 12:51 12:33 <br /> 5 Psi <br /> Change in Reading u Psi 5 Psi 5 Psi <br /> rassir=aii Criteria � Psi u Psi <br /> U <br /> No LOSS No LOSS i-si <br /> Tightness Test Results No Loss <br /> ® Pass ❑ Fail ® Pass ❑ Fail No Loss <br /> Pipe Run ID ® Pass ❑ Fail ® Pass ❑ Fail <br /> Pipe Manufacturer Gas Vapor Dsl Product <br /> Smith Dsl Vent <br /> TPst Start Time Smith Smith <br /> 11:36 <br /> Initial Reading <br /> 5 Psi 11:54 11:39 <br /> i 5 Ps <br /> Test End Time 5 Psi <br /> Final Reading 12.36 12:54 <br /> 5 Psi12:39 <br /> Change in Reading 0 Psi 5 Psi 5 Psi <br /> Pass/Fail Criteria 0 Psi 0 Psi <br /> Tightness Test Results No Loss No Loss <br /> ® Pass ❑ Fail No Loss <br /> Additionai copies of this page may be attached. Pass ❑ Fail ® Pass ❑ Fail <br /> ❑ Pass ❑ Fail <br /> All tests marked "Fail'and any repairs made before or during the tightness <br /> the COMMENTS section. test must be described in <br /> Paso 7 .,s e <br />
The URL can be used to link to this page
Your browser does not support the video tag.