My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
816
>
2300 - Underground Storage Tank Program
>
PR0231470
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 3:49:27 PM
Creation date
2/8/2023 1:25:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231470
PE
2361
FACILITY_ID
FA0003911
FACILITY_NAME
VAN DE POL ENTERPRISES INC
STREET_NUMBER
816
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102010
CURRENT_STATUS
01
SITE_LOCATION
816 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> oannrt Form <br /> Underground Storage Tank <br /> Secondary Containment Te <br /> 8. SUMP/UDC TEST sting Report Form <br /> Test Method Developed by ❑ <br /> Test Type Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test l= "h CJ`i�-,ment I_IgP,�: Caldwell ® Hydrostatic <br /> _ll Level Change Indicator <br /> Sump/UDC ID <br /> 1-87-ps <br /> Sump Manufacturer W 2-91-PS 3-Dsl-PS <br /> estern FG Western FG <br /> Sump Depth (inches) 40 1/2" I I Western FG pp <br /> Sump Bottom to Top of 39�� 381/2" <br /> Pe PenI V <br /> Highest Pi 14" <br /> Penetration 15" <br /> 17" <br /> (inches) <br /> Test Start Time 12:42 <br /> iniiiai Readin �� 1:17 1:22 <br /> g .VV1 <br /> Test End Time .�®1 <br /> .`""1 <br /> 1:12 <br /> Final Reading .001 1.47 1:52 <br /> 0 <br /> Change in Reading •001 .001 <br /> 0 <br /> Pass/Fail CriteriaI > .002 0 <br /> Tightness Test ResultsI I pp <br /> ® Pass 111 Fail > •002 > .002® Pass ❑ FailI II <br /> ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID <br /> UDC 1$2 UDC 3$4 <br /> Sump Manufacturer Western FG UDC 5$6 <br /> Sump Depth (inches) 30" Western FG Western FG <br /> 30" <br /> l ii-I Rnttnrrm to Toof 2�� 30" <br /> Highest Pipe Penetration 11 13" <br /> (inches) <br /> Test Start Time 12:27 <br /> 12:32 12:37 <br /> Initial Reading .001 <br /> .001 .001 <br /> Test End Time 12:57 <br /> 1:02 1:07 <br /> Final Reading .001 <br /> .001 .001 <br /> Change in Reading 0 <br /> 0 0 <br /> Pass/Fail Criteria > .002 <br /> —>--—0000—2 > .002 <br /> Tightness Test Results ® Pass D Fail ® pass D Fail <br /> Pass D Fail © Pass [� Feii <br /> Additional copies of this page may be attached. <br /> i <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Pana q of a <br />
The URL can be used to link to this page
Your browser does not support the video tag.