My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
816
>
2300 - Underground Storage Tank Program
>
PR0231470
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 3:49:27 PM
Creation date
2/8/2023 1:25:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231470
PE
2361
FACILITY_ID
FA0003911
FACILITY_NAME
VAN DE POL ENTERPRISES INC
STREET_NUMBER
816
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102010
CURRENT_STATUS
01
SITE_LOCATION
816 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Foran <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment 11-,Pri Caldwell Level Change Indicator <br /> Sump/UDC ID 1-87-FS 2-91-FS 3-Dsl-FS <br /> Sump Manufacturer Western FG Western FG Western FG <br /> Sump Depth (inches) 39" 38" 40" <br /> Sump Bottom to Top of 15" 17" 14" <br /> Highest Pipe Penetration <br /> (inches) <br /> -res+ Start Time 11:42 11:47 12:22 <br /> initiai Reading .0^1 ,Y01 .()n4Test End Time 12:12 12:17 12:52 <br /> Final Reading .001 .001 .001 <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria I No Loss No Loss No Loss <br /> :Tightness Test Results ® Pass ❑ Fail INPass ❑ Fail [RPass ❑ Fail ❑ Pass ❑ Fail <br /> F <br /> mp/UDC ID <br /> mp Manufacturer <br /> mn <br /> siumn Rnt+n + Tnn'nf <br /> ..V �rn rt,,. <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results 1 n Pass 011 Fait n Pass n Fail t1 Pacc ri Fail <br /> ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the-COMMENTS section. <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.