My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
153
>
2300 - Underground Storage Tank Program
>
PR0231389
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:39 AM
Creation date
2/14/2023 8:26:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231389
PE
2361
FACILITY_ID
FA0003709
FACILITY_NAME
BILLJAR VALERO
STREET_NUMBER
153
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336607
CURRENT_STATUS
01
SITE_LOCATION
153 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\bmascaro
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aff � �� Dynamic Back Pressure Test <br /> o d a e$t 416 2nd Street Z TP 201.4 <br /> Galt, Ca. 95632 <br /> (209)744-0112(800)524-9087 FAX(209)744-0116 Z Static Pressure Decay Test <br /> TP 201.3 <br /> Owner/Contractor/Eng: TEST DATE: 11/9/2022 TIME: UST ® AST ❑ <br /> SITE NAME: BILLJAR VALERO ED STEARNS ❑ PT ❑ Startup Test ® Compliance Test <br /> Address: 153 E 11TH STREET AGENCY: SJVAPCD <br /> I declare, under penalty of perjury under the laws of the state <br /> City: TRACY of California that based on information and belief formed Inspector: <br /> Phone: <br /> after reasonable inquiry, the statements and information <br /> provided in the document are true,accurate,and complete. present Not Present <br /> Contact: TECH SIGNATURE: <br /> or Facility# <br /> Confirmation# <br /> #DISPENSERS 4 DISPENSER Make: WAYNE NOZZLE Make: VST PV Valve Make:HUSKY <br /> #TOTAL NOZZLES 8 Model: Model: Model:5885 <br /> MANIFOLDED: Yes ® No❑ BALANCE ® ASSIST ❑ Assist Type: <br /> Tank 1 Tank 2 Tank 3 Tank 4 TOTAL <br /> Fuel Grade 87 SYP 87 M 91 ALL Initial pressure before testing-0 "we <br /> #Nozzles per Tank 8 8 8 8 <br /> EQUIPMENT <br /> Actual Tank Capacity 10152 10152 10152 1 30456 Decay: x Blockage: x <br /> Gasoline Volume 6475 6422 2834 15731 <br /> Incline Manometer ❑ Incline Manometer ❑ <br /> Ullage(Capacity minus Volume) 3677 3730 7318 14725 Magnehelic Guage ❑ Magnehelic Guage <br /> Phase I System Type:2pt EVR Coaxial E V R EVR <br /> Digital Manometer ® Digital Manometer ❑ <br /> Initial Test Pressure(Inches water)2i0 2.0 Equipment Calibration Date: 10/1/2022 <br /> 1.99 Drift Check End Value: 0 PASS <br /> PSI @ 1 Minute(Inches water) Nitrogen Intro.Point: PHASE 1 <br /> PSI @ 2 Minutes 1.98 <br /> PSI @ 3 Minutes 1.98 <br /> Allowable Fill Time A 2 scfm 10.06 <br /> PSI @ 4 Minutes 1.97 Time 1:4.29 <br /> Final Pressure @ 5 Minutes(Inches water) 1.97 Time 2: <br /> Allowable Final Pressure(CARB) 1.89 Time 3: <br /> Liquid Removal Check,Dynamic Back <br /> ------- Pressure(if due),and Parts& <br /> ------- ------- ------- PASS Repairs Are Listed on Page 2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.