My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
153
>
2300 - Underground Storage Tank Program
>
PR0231389
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:39 AM
Creation date
2/14/2023 8:26:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231389
PE
2361
FACILITY_ID
FA0003709
FACILITY_NAME
BILLJAR VALERO
STREET_NUMBER
153
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336607
CURRENT_STATUS
01
SITE_LOCATION
153 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\bmascaro
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DYNAMIC BACK PRESSURE TEST DATA (BLOCKAGE) TECHNICIAN: ED STEARNS <br /> Cert# Exp. <br /> Site: Date Time: <br /> Nozz/Fuel 20 CFH 60 CFH 80 CFH PASS/FAIL Nozz/Fuel 20 CFH 60 CFH 80 CFH PASS/FAIL <br /> Grade (.15"Water) (.45"Water) (.95"Water) Grade (.15"Water) (.45"Water) (95"Water) <br /> .60CFH .80CFH --- --- <br /> LIQUID REMOVAL CHECK **See Long Form Test Report for Wet Failure Testing Blockage Tester Integrity: <br /> D=Dry .50"w.c. 5 minutes PASS <br /> 1 ®DRY ❑DRY ❑DRY ❑DRY ❑DRY []DRY [-]DRY ❑DRY [-]DRY <br /> ml ml ml m1 ml m1 m1 ml nil <br /> 2 ®DRY [:]DRY [:]DRY ❑DRY []DRY [:]DRY ❑DRY [:]DRY ❑DRY <br /> ml ml ml ml ml ml ml ml ml <br /> ❑DRY [:]DRY [:]DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY <br /> Rd ml ml ml m1 ml ml ml ml <br /> [-]DRY ❑DRY ❑DRY [-]DRY ❑DRY [-]DRY [-]DRY ❑DRY [-]DRY <br /> Rd ml ml ml ml ml ml ml ml <br /> ® Job Complete Repairs Done to Pass Test: <br /> ❑ I Not Complete Repairs Still Needed: <br /> Parts: None Drop Tube rings Fill Adaptor Gaskets Hoses Whip Hose <br /> Nozzles Breakaways PV Valves Others: <br />
The URL can be used to link to this page
Your browser does not support the video tag.