SAN J O A Q U I N Environmental Health Department <br /> COUNTY <br /> d . Verification of all pipe setbacks , cross - overs , and burial depth , in accordance with <br /> manufacturer specifications , and verification of appropriate piping backfill . <br /> e . Integrity testing of all sumps , in accordance with manufacturer specifications . <br /> of. Verification of the dispenser footprints contained by the UDCs . Any potential leaks from <br /> piping and fuel filters must drain directly into UDCs . <br /> g . Visual inspection of the piping within the dispensers . <br /> h . Corrosion protection : Verify corrosion protection for direct bury spill buckets prior to <br /> backfilling . <br /> i . Spill bucket test : Verify minimum 5-gallon capacity . Pass a one hour hydrostatic test ( or <br /> equivalent) . Verify proper drainage method . <br /> j . Verification of overfill prevention : Measurement of drop tubes to verify 95 % tank volume <br /> shut off, verification of external audible/visual alarm activation when tank is 90 % full , or <br /> other approved method . <br /> k . Verification that ball float (s ) , if installed , do not interfere with the installed flapper valve . <br /> I . Monitoring system functionality : Functionality of the monitoring system , including all <br /> sensors , must be verified to ensure monitoring has been restored to meet the <br /> requirements of CCR Title 23 and California Health & Safety Code ( HSC ) Chapter 6 . 7 . <br /> If a cold start of the monitoring panel is performed , a copy of the alarm history shall be <br /> printed prior to performing the cold start , and made available at the time of EHD <br /> inspection . <br /> m . Leak detector test : Verify the device can detect a leak of 3 gallons per hour at 10 psi . <br /> Verify line volumes are appropriate for the make and model of the installed leak <br /> detectors . <br /> n . Since concrete will be broken near the 87 , 91 , and diesel tanks , a secondary <br /> containment test must be performed on all tanks once concrete is poured in accordance <br /> with the manufacturer' s guidelines . <br /> The facility cannot o erate the 87, 91, or diesel UST systems, or receive fuel in the 87, 91, or <br /> diesel tanks prior to the EHD inspection and approval. <br /> 4 . Secondary containment testing for the turbine sumps , UDCs , and product piping is required six <br /> months after installation . Provide 48 hours notification to the EHD when this test is scheduled . <br /> 5 . Any individual installing underground storage systems or components must possess , or work <br /> under the direct and personal supervision of an individual physically present at the work site at <br /> all times while work is being performed who possesses , all of the following : <br /> • One of several permissible valid , current contractor licenses issued by the Contractors <br /> State License Board ( CSLB) <br /> • A current UST Installation/ Retrofitting certificate issued by the International Code Council <br /> ( ICC ) <br /> • A valid , current certificate of training from the manufacturer(s ) of the component (s ) being <br /> installed <br /> 6 . Any individual performing the work of a service technician must possess , or work under the direct <br /> and personal supervision of an individual physically present at the work site at all times while <br /> work is being performed who possesses , all of the following : <br /> • One of several permissible valid , current contractor licenses issued by the CSLB <br /> • A current California UST Service Technician certificate issued by the ICC <br /> 2 of 3 <br />