Laserfiche WebLink
REVISIONS <br /> NOTEOma - Q NOTES S S S <br /> G OF THE FUEL t. PROVIDE I VLONG T DIAMETER FRP SLEEVE MOUNTED TO THE SUMP FRAME AND SECURED 2' OFF BOTTOM. SENSOR TO BE PLACED INSIDE OF FRP SLEEVE AND <br /> DISPENSERS SHALL BE OPERABLE RESTON SUMP BOTTOM. m TITITT <br /> AITH ONE HAND AND SHALL NOT <br /> R R <br /> REQUIRE IS PING. PINCHING, 2 sLOPE PRODUCT PIPING BACK TO TANK MINIMUM ,IB'PER 1'U'. L <br /> OR TM45RNG NG OF OF THE WRIST. 241 243242 245 - S <br /> 3. PIPING SHALL BE LAID AND CONTINUOUSLY SUPPORTED ON A6' COMPACI'EO PEA GRAVEL BEDDING. PIPING SHALL NOT BE SUPPORTED BY BLOCKS. PIANKS. OR <br /> OTHER DEBRIS. <br /> 4. ALL ENTRIES TO BE PERPENDICULAR TO CONTAINMENT SUMP. <br /> 5. ORIENT PIPING PENETRATION BOOTS WITH THE FILL PORT UP (12 OCLOCK POSITION). JUMPER TUBES TO REMAIN INSTALLED ONCE ALL TESTING IS COMPLETED. <br /> 6. SECURE THUMBSCREW'OF FLEX CONNECTOR CLAMP WITH INCLUDED NYLON TIE <br /> >. DISPENSER DECALS TO BE SUPPLIED AND INSTALLED BY DINNER. <br /> 148 8. AFTER DISPENSERS ARE PURGED, INSTALL NEW FILTERS, 6 <br /> ® 9. CONDUIT SEALING AT DISPENSERS SHALL BE INSTALLED AS PER CEC-2922514.9 AMB. <br /> FRP PIPE SHALL HOVE A MINIMUM OF 4' OF STRAIGHT PIPE OUTSIDE OF SUMPS _ <br /> BEFOREa DIRECTIONAL CHANGE PER ALBERTSONS SPECIFlCATIONS. <br /> VAPOR RETURN LINE ' 5 n PRESSURE SENSOR <br /> FROM DISPENSERWRAP RUBBER SHIM MOM <br /> O O o® l =� _ — — llil— — — —= SENSOR BEFORE INSERTINGIIN CCLLAMPD <br /> 0 0 o W METER 52 _ — — _ — — <br /> 2s3 sss zs2 1sD FLO PRESSURE SENSING PORT <br /> 2103 CABLE <br /> �22CX214) of <br /> 531 NLESS STEEL SIMPSON STRONG-TIE HEAVY HEYJUNCTION BOX 537 ' ( TUBE AS REQUIRED <br /> TM F1554 GRADE 35 ANCHOR. WITH OVERSIZED J <br /> EXTEND CONDUIT TO ELECTRONIC HEAD IN DISPENSER WASHER AND }R2^ MIN. EMBEDMENT, (BITOiaL UST IN PLACE. L� ITCH TOORAIN .25' VE KCAL PE m <br /> H CONDUIT ELBOW 538 0 V ' ( PER IY HORIZONTAL R ` <br /> PETROLEUM A SEISiaNT CLEAR CAULKPRODUCT <br /> /�� _ _ _ _ _ _ _ _ _ _ _ 5528 CAULK AROUND EACH DISPENSER WITH - <br /> 205 9 539 OONOTUSEASELF1EV0.1NGPRODUCT SEALOFF�9 539 O <br /> P r - - - - - - — - - - D F. <br /> F. p <br /> 4 4 i' - - - - - - — - - - - - � e o <br /> 'r - - - - <br /> VAPOR RETURN <br /> 3n1 LINES EAR VALVE ZO n <br /> 308 <br /> v <br /> = 300 304 DISPENSER SUMP <br /> �C49] 4034 5 L--------------------- -----------� <br /> CV 521 211 49] V� ASRE REQUIRED <br /> TUBE <br /> B CONDUIT TO TLE CONSOLE AS REQUIRED <br /> NOTE G fJ <br /> DIAGRAM C ON SHEET <br /> WMETER AND PRESSURE <br /> APPLIESTO <br /> SENSOR O F1 <br /> WIRING UN SHA DISPE Zf/ <br /> CONDUIT <br /> SAME <br /> CONDUIT <br /> TO O <br /> CONSOLE - <br /> (OBSER <br /> ASECTION A-A THROUGH DISPENSER SUMP �c PRESSURE SENSOR & FLOW METER INSTALLATION ✓ <br /> if III SCALE , , lVlG v GALE NOT TO SCALE <br /> - <br /> NU <br /> oui51DE Z <br /> rz4IINSIDE <br /> 1 ,rr N.P.T, PRODUCT 42 O <br /> (PREMIUM) t'S' OR OR Z <br /> OFOR VAPOR <br /> SUMPSENSORCONOVIT ANCHOR BOLTS, 8 SPACES FOR VAPOR 20,4 ® IIINV 12' SLOTS FOR W <br /> POWER CONDUIT • $ C J <br /> • CA c W I¢- <br /> Z W <br /> Q � <br /> _BIGw <br /> m ® Z Z <br /> _ A W W <br /> A w n ® U) <br /> WEST SIDE 308 Q.® <br /> EAST SIDE <br /> LOW VOLTAGE CONDUIT FOR PT4034PEI. GRAVEL DIAMOND Z ENGINEERING, INC. <br /> f-1? N.P.T. PRODUCT A3 ///--- ACTED OR CUM U5VO STATE 134 <br /> 10 (DIESEL) UNDISTURBED SOIL (TYPICAL) <br /> MORE 36v,M1 <br /> 1-trz N.P.T. P(REGULAR) t N.P.T, VAPOR RECOVERY OUTLET, <br /> OPTIONAL <br /> S10EA T I IIIpill �- •• SULE��•��: •DATE • • <br /> JUNCTION BO% AS NOTED Jt812022 <br /> DRAWN BY; PROJECT ND.: <br /> DRF cA 4rz <br /> X01 DISPENSER MOUNTING DIAGRAM �r�1 SECTION B-B THROUGH TERMINATING DISPENSER SUMP DR WNGN <br /> ) L7 1 SULE1-1R" = 1' O" L1 SULE. 1' = ,'-0" FD-2 <br />