Laserfiche WebLink
REVISIONS <br /> NOTE BEEBHEE M-, O" NOTES: a S <br /> PRO 2-t <br /> THE OPERABLE PMTS OF THE FUEL VIDE IV LONG DIAMETER FRP SLEEVE MOUNTED TO THE SUMP FRAME AND SECURED 2- OFF BOTTOM, SENSOR TO BE PLACED INSIDE OF FRP SLEEVE AND <br /> DISPENSERS SHALL BE OPERABLE <br /> REST ON SUMP BOTTOM, <br /> NTH IE HAND SHAIJ- NOT <br /> REQUIRE TIGHT GROPING, PINCHING, 2 SLOPE PRODUCT PIPING BACK TO TANK MINIMUM t, PER t'A". _ 6 3 <br /> RI <br /> OR TWISTING OF THE WRIT B•3. PIPING SNAIL BE I-AD AND CONTINUOUSLY SUPPORTED ON A V COMPACTED PEA GRAVEL BEDDING, PIPING SHALL NOT BE SUPPORTED BY BLOCKS. PLANKS. OR <br /> 245 OTHER DEBRIS. <br /> 4, ALL ENTRIES TO BE PERPENDICULAR TO CONTAMMENT SUMP. <br /> C ORIENT PIPING PENETRATION BOOTS WITH THE FILL PORT UPJ120CLOCK POSITION). JUMPER TUBES TO REMAIN INSTALLED ONCE ALL TESTING IS COMPLETED. <br /> 6. SECURE THUMBSCREW OF FLEX CONNECTOR CLAMP WITH INCLUDED NYLON TIE <br /> 7. DISPENSER DECALS TO BE SUPPLIED AND INSTALLED BY OWNER. - <br /> 0. AFTER DISPENSERS ARE PURGED, INSTALL NEW FILTERS. <br /> ® <br /> IT <br /> s. c <br /> ONWIT SEALING AT DISPENSERS SHALL BE INSTALLEDaS PER CEG2022 Stas AIB. <br /> FAR PIPE SHALL HAVE A MINIMLA F 4' CF STRAIGHT PIPE BEFORE A DIRECTIONAL CHANGE PER ALLSER SONS SPECIFICATIONS.UTSIDEF SU _ <br /> ��� Elli - <br /> 0 2B, T 9 r---------------------------------i 4 4 4 a <br /> FROM USPENSER <br /> 2 ISD FLOW METER <br /> +t 2 3 <br /> CABLE <br /> 222 214 <br /> TM LESSF1554 STEEL 36 ANCHOR, <br /> WITH OVERSIZED <br /> HEX <br /> EXTEND CONDUIT TO ELECTRONIC HEAD IN DISPENSER 531 HEAD ASTM f,55a GRADE 36 ANCHOR. WITH OVER52ED JUNCTION BO% 53T I i J <br /> WASHER AND 3-t(_•' MIN, EMBED i, (8) TOTAL, CAST IN PLACE ' m m <br /> CONDUIT ELBOW 530 U U I ro ti <br /> CAULK AROUND EACH DISPENSER WITH <br /> 205 9 PETROLEUM RESISTANT CLEAR CAULK: Y O <br /> DO NOT USE A SELf1EVELING PRODUCT I- — — — — — — 4 <br /> SEALOFF 9 539 <br /> • P e r _ _ _ _ - - _ _ _ - - - - � TOPOF ISLAND <br /> � Oz <br /> o <br /> All <br /> A 44 ° ■ <br /> El <br /> ESEARLELINVAV222308 <br /> ; a <br /> a <br /> ry <br /> 304 304 <br /> DISPENSER SUMP <br /> < 4 5403 403 4 5 <br /> 211 <br /> CONDUUIITv O^-'A 52 B CONDUIT TO TLS CONSOLE NOTE. <br /> DIAGRAM C ON SHEET F3 �/Yl <br /> D <br /> FLOW METER AND PRESSURE ONLY APENSERSLi <br /> TO 3+0 <br /> SENSOR WIRING CAN SHARE THE DISPENSERS <br /> SAME CONDUIT TO CONSOLE '= <br /> (OBSERVE POLARITYI) <br /> �n1 SECTION A-A THROUGH DISPENSER SUMPPRESSURE SENSOR & FLOW METER INSTALLATION <br /> MSCALE. 1 = -0 1 C SCALE LOT TO SCALE <br /> Nd <br /> SIDE Z <br /> 1-,7 N.P.T. PRODUCTFz - BIDE 221 <br /> TREMIUM) 213 OR .Z <br /> OR OFORVAPOR _ <br /> SUMP SENSOR CONDUIT Q LU J <br /> ANCHOR BOLTS, 0 SPACES FOR VAPOR 2Oi4 <br /> POWER CONDUIT <br /> W <br /> . . JAA . _SLAB W <br /> r W <br /> 3x\ p=® IN <br /> Z N <br /> m C ., 3o ztt L!J 2 <br /> W <br /> A .DL _ A 308 <br /> 304 <br /> WESTSIDE ® ® C) <br /> EAST SIDEIT <br /> 4034 5O , � PEAGRAVEL DIAMONOZ ENGINEERING, INC. <br /> LOW VOLTAGE CGNDUIT11 FOR UCT ON `./v56TO STATE ROAD <br /> OR CUE,EIUMID, OHMIU <br /> OFOR VAPOR UNDISTURI OR BED SOIL (TYPICAL) PHONE IQI64ZZ4501 <br /> 1-17 N.P.T. PRODUCT 41 - N.P.T. VAPOR RECOVERY OUTLET. <br /> (REGULAR) OPTIONAL <br /> JUNCTION BO% SIDEA I�I� 1 1J � AS NOTED )•eDATE"v <br /> DRAWN BY: PRO.IECT NO: <br /> 42t2 <br /> DISPENSER MOUNTING DIAGRAM ten\ SECN B-B THROUGH TERMINATING DISPENSER SUMP DRAwNGNo. <br /> USCALE 1-17 = 1' v E , - ,TIO� FD-3 <br />