Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Incon Tester <br /> Sump/UDC ID 87-1 A STP 87-1 B STP 87-2 A STP 87-2 B STP <br /> Sump Manufacturer Fiberglass Fiberglass Fiberglass Fiberglass <br /> Sump Depth (inches) 712 74" 70" 73" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 162 16" 16" 16" <br /> (inches) <br /> Test Start Time 12:27 pm 12:27 pm 10:21 am 10:40am <br /> Initial Reading 6.0255 6.7243 4.6395 6.3225 <br /> Test End Time 12:42 pm 12:42 pm 10:36 am 10:55 am <br /> Final Reading 6.0253 6.7242 4.6413 6.3223 <br /> Change in Reading 0.0002 0.0001 -0.0018 0.0002 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID 91 A STP 91 B STP Diesel STP 87-1 Fill <br /> Sump Manufacturer Fiberglass Fiberglass Fiberglass Fiberglass <br /> Sump Depth (inches) 742 71°° 71°° 801, <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 162 16" 16" N/a <br /> (inches) <br /> Test Start Time 12:27 pm 10:21 am 12:27 pm 8:41 am <br /> Initial Reading 5.5556 2.8259 2.1857 4.3932 <br /> Test End Time 12:42 pm 10:36 am 12:42 pm 8:56 am <br /> Final Reading 5.5554 2.8269 2.1853 4.3931 <br /> Change in Reading 0.0002 -0.0011 0.0004 0.0001 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results 0 Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3of5 <br />