Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Incon Tester <br /> Sump/UDC ID 87-2 FILL 91 FILL Diesel FILL UDC 1/2 <br /> Sump Manufacturer Fiberglass Fiberglass Fiberglass OPW <br /> Sump Depth (inches) 80" 75" 73" 31" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration N/A N/A N/A 20" <br /> (inches) <br /> Test Start Time 8:41 am 9:07 am 10:21 am 4:06 pm <br /> Initial Reading 5.0554 3.6030 6.5440 6.6892 <br /> Test End Time 8:56 am 9:22 am 10:36 am 4:21 pm <br /> Final Reading 5.0557 3.6030 6.5437 6.6891 <br /> Change in Reading -0.0003 0.0000 0.0003 0.0001 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID UDC 3/4 UDC 5/6 UDC 7/8 UDC 9/10 <br /> Sump Manufacturer oPW oPW oPW oPW <br /> Sump Depth (inches) 31" 31" 31" 31" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 20" 20" 20" 20" <br /> (inches) <br /> Test Start Time 3:23 pm 1:23 pm 4:06 pm 1:23 pm <br /> Initial Reading 3.7279 5.1804 6.8842 4.3756 <br /> Test End Time 3:39 pm 1:38 pm 4:21 pm 1:28 pm <br /> Final Reading 3.7274 5.1806 6.8841 4.3756 <br /> Change in Reading 0.0005 -0.0002 0.0001 0.0000 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />