My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
502
>
1600 - Food Program
>
PR0161603
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 2:23:27 PM
Creation date
3/2/2023 1:49:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161603
PE
1623 - RESTAURANT/BAR 1-20 SEATS
FACILITY_ID
FA0001271
FACILITY_NAME
QUICKLY MANTECA
STREET_NUMBER
502
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22109001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\ymoreno
Supplemental fields
Site Address
502 E YOSEMITE AVE MANTECA 95336
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />�IRAS <br />UNIT TA6 <br />IN <br />IAll1, <br />1All <br />i <br />MAKE UP AIR <br />EXHAUST AIR <br />BLD6. PRESS. <br />AH -I <br />2800 <br />21715 <br />315 <br />- <br />- <br />315 <br />MUA-I <br />1300 <br />- <br />1300 <br />- <br />- <br />1300 <br />KEF-I <br />- <br />- <br />- <br />- <br />1440 <br />-1440 <br />LF -I <br />_ <br />_ <br />_ <br />- <br />120 <br />-120 <br />- rad heags <br />1 M\wIng <br />�H <br />NZ <br />Ccc <br />CL <br />111 <br />TOTAL <br />4100 <br />2115 <br />1615 <br />- <br />1560 <br />55 <br />NEIAll <br />90041-1 <br />1mma <br />10 h <br />10 <br />1 <br />MEN <br />"' <br />MEN <br />INN4 <br />ME <br />vb..q;:r <br />�-r <br />m- <br />PAPINido <br />IproOffiddher,54AKFArIS <br />ZNJ <br />Nam.IN <br />m <br />2 <br />11 <br />OUTSIDE AIR CALCULATION: <br />AH -I - AREA = 2,100 50. FT. / 100 50. FT. PER OCCUPANT =21 OCCUPANTS <br />21 OCCUPANTS x 15 GFM PER PERSON = 315 GFM <br />AIR BALANCE SCHEDULE <br />UNIT TA6 <br />SUPPLY AIR <br />RETURN AIR <br />OUT5IDE AIR <br />MAKE UP AIR <br />EXHAUST AIR <br />BLD6. PRESS. <br />AH -I <br />2800 <br />21715 <br />315 <br />- <br />- <br />315 <br />MUA-I <br />1300 <br />- <br />1300 <br />- <br />- <br />1300 <br />KEF-I <br />- <br />- <br />- <br />- <br />1440 <br />-1440 <br />LF -I <br />_ <br />_ <br />_ <br />- <br />120 <br />-120 <br />vv oo <br />�H <br />NZ <br />Ccc <br />CL <br />111 <br />TOTAL <br />4100 <br />2115 <br />1615 <br />- <br />1560 <br />55 <br />v� r <br />DUCT CONSTRUCTION STDS: <br />DUCTS AND PIPING SHALL BE DE51ONED AND INSTALLED TO MEET THE REQUIREMENTS Or THE GURRENT <br />EDITION OF THE SMAGNA DUCT CONSTRUCTION STANDAR5 AND SEISMIC RESTRAINT MANUAL. INSTALLER <br />SHALL HAVE A COPY OF THE MANUAL ON 51T AT THE TIME OF INSPECTIONS. WHERE 015GREPANCIE5 <br />OCCUR IN THE FIELD, IN5PEGTION WILL HAVE JURISDICTION, OR JUSTIFICATION SHALL BE PROVIDED FOR <br />STRUCTURAL REVIEW. CMG 6023, 6033 THRU 603.3.3,603.b, 5MA6NA4VAC CONSTRUCTION STANDARDS <br />AND SEISMIC RESTRAINT MANUAL AND GBG. <br />MECHANICAL NOTES: <br />I. ALL SHEET METAL DUCTS SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH CHAPTER 6 <br />OF THE CALIFORNIA MECHANIGAL CODE (201q GMC) <br />2. ROUND DUCTS MAY BE USED WHERE ATTIC SPACE PERMITS. FLFXQBLE DUCTS AT GONNEGTION TO DIFFUSER <br />15 PERMITTED BUT SHALL BE LIMITED TO A MAXIMUM LENGTH OF 5'-0'. <br />3. JOINTS OF DUCT SYSTEM SHALL BE MADE SUBSTANTIALLY AIR T16HT BY MEANS OF TAPE, 6A5KETIN6 OR <br />OTHER CODE COMPLIANT MEANS <br />4. RESTROOM EXHAUST FANS OR OT1ER SIMILAR EXHAUST FANS SHALL HAVE ROUND GALVANIZED SHEET <br />METAL DUCTS THRU THE ROOF <br />5. EVERY SUPPLY -AIR DUCT AND RETURN -AIR DUCT AND PLENUM OF A HEATING OR COOLING SYSTEM SHALL <br />BE INSULATED WITH NOT LE55 THAN THE AMOUNT OF INSULATION SET FORTH IN TABLE "b0', EXCEPT <br />FOR DUGT5 AND PLENUMS L15FD EXCLUSIVELY FOR EVAPORATIVE COOLING SYSTEMS. <br />b. WORK TO BE PERFORMED BY OTHER5: <br />A. PLUMBING CONTRACTOR: 6A5, WATER AND CONDENSATE PIPING INCLUDING CONNECTIONS WITH SHUT <br />OFF VALVE <br />B: ELECTRICAL CONTRACTOR: ALL POWER AND CONTROL CONDUIT, WIRING, DISCONNECTS AND FINAL <br />CONNECTIONS. NO FIELD SUPPLIED ELECTRICAL DEVICE SHALL BE MOUNTED ON AIR GOMDTIONINI6 <br />UNITS AND NO RI61D ELECTRICAL GONNEGTIOS SHALL BE MADE TO MECHANICAL EQUIPMENT <br />G. 6ENERAL GONTRAGTOR: CUTTING, FRAMING, PATCHING, FURRING, PAINTING, POURED OR FORMED <br />CONCRETE. <br />1. CODES RULES AND REGULATIONS: <br />ALL WORK AND MATERIAL SHALL BE PERFORMED AND INSTALLED IN COMPLIANCE WITH THE FOLLOWING <br />CODES AS ADOPTED AND AMENDED BY THE INSPEGTIN6 AUTHORITY. NOTHING IN THESE PLANS SHALL BE <br />CONSTRUED TO PERMIT WORK NOT CONFORMING TO THESE CODES OR OTHERS APPLICABLE TO THIS <br />PROJECT: <br />A. CALIFORNIA BUILDING 5TANDARD5 CODE5 (PLUMBING AND MECHANICAL CODES) (201q EDITION5) <br />8. WHERE APPLICABLE, ALL HOLES OR VOIDS CREATED TO EXTEND MEGHANIGAL SYSTEMS THROUGH FIRE <br />RATED FLOORS AND WALLS SHALL BE SEALED BY THE MECHANICAL CONTRACTOR WITH AN INTUMESCENT <br />MATERIAL CAPABLE OF EXPANDING UP TO 10 TIMES WHEN EXPOSED TO TEMPERATURES BEGINNING AT <br />250 DEG. F. IT SHALL BE UL CLASSIFIED AND HAVE RATIN65 TO 4 HOURS PER ASTM E-814 NL 41q) <br />q. PROVIDE PERMANENT IDENTIFICATION ON ALL HEATING AND COOLING EQUIPMENT AS TO THE AREA OF <br />5PAGE SERVED BY EQUIPMENT. <br />1 10. ALL NVAG SYSTEMS PROVIDING 2000 CFM OR MORE PER AREA SHALL BE EQUIPPED WITH A SMOKE <br />O ,�..'-�....-. ,.i w � !o-ry V c:K ! AOAc: C � cvcTG2A !. • tmnL.M I IPlMI f]FTF%TI(IN (7F SMii)I.F <br />A SMOKE DETECTOR SHUTDOWN TEST SHALL BE REQUIRED IN THE PRESENCE OF THE INSPECTING <br />AUTHORITY PRIOR TO ISSUANCE OF A MEGHANIGAL FINAL. THE ACTIVATION OF ANY DETECTOR REQUIRED <br />BY THI5 SECTION SHALL INITIATE A V151BLE AND AUDIBLE SUPERVISORY 516NAL AT A CONSTANTLY <br />ATTENDED LOCATION (2019 GBG 9012.13.12 AND 20111 GW, 608.1) <br />11, JOINTS AND SEAMS OF DUCT 5Y5TEM5 AND THEIR COMPONENTS SHALL NOT BE SEALED WITH CLOTH BACK <br />RUBBER ADHE51VE DUCT TAPES UNLESS 5" TAPE 15 USED IN GOMBIHATION WITH MASTIC OR DRAW BANDS <br />12. ALL THERMOSTATS SHALL BE MOUNTED 46" ABOVE FINISH FLOOR <br />EQUIPMENT SCHEDULE: <br />EXISTING 1 TON PK6. HVAC UNIT, GAS HEAT / ELECT. COOLING UNIT <br />11.0 EER, 112 IEER, 80% ARE <br />HEATING CAPACITY: 84A00 BTUH <br />COOLING CAPAGIT'(: 84,000 BTUH <br />DUCT TION: R-8 <br />SUPPLY SIDE DETECTORS TO INITIATE 5H UTDO <br />UPON PRESENCE ARE REQUIRED <br />MIN. VENT = 258 CFM <br />GFM PER SYSTEM = 2800 / UNIT WT. = 625 LB5. <br />MOUNTED ON EXIST. MECHANICAL PLATFORMS <br />EF -I 110 CFM RESTROOM EXHAUSTER INTERLOCKED WITH RESTROOM LIGHT. <br />VENT THRU ROOF WITH BAGKDRAFT DAMPER TO BE 'DAYTON" <br />MODEL NO. T-TR42 / 12CV / 120 GFM / 6" DIA. VTR <br />SEE EXHAUST HOOD PLANS ON FOLLOWING 51-11EET5 FOR SPECS <br />SEE EXHAUST HOOD PLANS ON FOLLOWING SHEETS FOR SPE05 <br />NOTE: <br />I. MOUNT THERMOSTAT AT +48" ABOVE FIN15HED FLOOR <br />2. EXHAUST FANS SHALL TERMINATE A MIN. OF 10'-0' FROM ANY <br />OUT51M AIR INTAKE <br />3. UNDERCUT DOORS IN ROOMS WITHOUT RETURN AIR DUCTS <br />I" FOR RETURN AIR <br />SUPPLY SIDE SMOKE DETECTOR:DENOTES REWjIzED _ <br />SMOKE DETEGTOR5. CALLIIFORNIA ST IRESMOKEE TECTOR MAR5HAL5RLIST> PRODUCTS 240-1004:0116 (SEEAND COLS" H5I00 NOTE 10 ABOVE) <br />MECHANICAL DETAILS: <br />SEE SHEET "M-2' FOR TYPICAL MECHANICAL DETAILS <br />CALGreen HVAC REQTS: <br />I. AT THE TIME OF ROUGH INSTALLATION AND DURING STORAGE ON THE! CONSTRUCTION SITE UNTIL FINAL <br />STARTUP OF THE HEATING, COOLING AND VENTILLATION EQUIPMENT, ALL DUCT AND OTHER RELATED AIR <br />0I5TRI6UTION COMPONENT OPENINGS 5HALL BE COVERED WITH TAPE, PLASTIC, SHEET METAL OR OTHER <br />METHODS ACCEPTABLE TO THE ENFORCING AGENCY TO REDUCE THE AMOUNT OF DUST, WATER AND DEBRIS <br />WHICH MAY ENTER THE SYSTEM (CALGreen 5.5043) <br />2. IN MECHANICALLY VENTILATED BUILDIN65, PROVIDE REGULARLY OCCUPIED AREAS OF THE BUILDING WITH <br />AIR FILTRATION MEDIA FOR OUTSIDE AND RETURN AIR THAT PROVIDES AT LEAST A 'MINIMUM EFFIGIENGY <br />REPORTING VALUE' (MERV) OF 8. MERV 8 FILTERS SHALL BE INSTALLED IN ACCORDANCE WITH THE <br />REQUIREMENTS OF 2019 GAL6reen SECT. 550453. <br />BALANCING AND TESTING: <br />THE HEATING, VENTILATION AND AIR C.ONDTIONIN6 SYSTEM SHALL BE BALANCED <br />IN ACCORDANCE TO THE 2019 CALIFORNIA MECHANICAL CODE, SECTION 314.1, <br />ITEM NO. 5, 5MACNA HVAG SYSTEMS TESTIN(5, ADJUSTING AND BALANCING <br />MERV 13 FILTERS: <br />PROVIDE MINIMUM EFFICIENCY REPORTING VALUE (NERV) OF 13 FILTERS FOR THE NEW HVAC SYSTEM. <br />MECHANICAL SYSTEMS INCLUDING HEATING AND AIR CONDITIONING SYSTEMS THAT SUPPLY AIR TO <br />HABITABLE 5PACE5 SHALL BE PROVIDED WITH AIR FILTER(5) HAVING A DE516NATED EFFICIENCY EQUAL <br />TO OR GREATER THAN MERV 13 WHEN TESTED IN ACCORDANCE WITH A5HRAE STANDARD 52.2, OR A <br />PARTICLE 51ZE EFFICIENCY RATING EQUAL TO OR GREATER THAN 50 PERCENT IN THE 030 - ID /M <br />RANGE AND EQUAL TO OR GREATER THAN 85 PERCENT IN THE ID - 3.0 /M RANGE, WHEN TESTED IN <br />ACCORDANCE WITH AHRI STANDARD 680. 20101 CEG 120.1(6) <br />:3 <br />N <br />N <br />OI <br />I <br />U <br />U <br />QI BACKCHECK 1/14/22 <br />JOB NO.: G UICKLYMAN WA <br />DRAWN BY: RODROX-5 <br />SHEET NO.: <br />M-1 <br />OF I SHEETS <br />DATE: 2/18/22 <br />CL <br />J <br />V <br />..Q <br />2 <br />G <br />Z <br />a� <br />C79J <br />.Q <br />Q O <br />dO <br />�J <br />W <br />Luco <br />Ov <br />vv oo <br />�H <br />NZ <br />Ccc <br />CL <br />111 <br />QI BACKCHECK 1/14/22 <br />JOB NO.: G UICKLYMAN WA <br />DRAWN BY: RODROX-5 <br />SHEET NO.: <br />M-1 <br />OF I SHEETS <br />DATE: 2/18/22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.