My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
2300 - Underground Storage Tank Program
>
PR0543446
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 3:10:07 PM
Creation date
3/8/2023 4:47:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0543446
PE
2351
FACILITY_ID
FA0024656
FACILITY_NAME
7-ELEVEN #38153
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
121 S CENTER ST
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEST INS IONS Socket <br /> POPPET&FLOAT MOVEMENT <br /> FOR 7ESTABLE MOORS ONLY <br /> TOOLS NEEEXD TOR TESTING: <br /> I- 1/4"square dove saension or 318'square dnve ear- � I <br /> tension with 31x3'to 1/4"sc let ad4pber. I , 1 <br /> 2. Torque wrench 11/4*or 318°square drive ratchet <br /> wrench. <br /> 3. Pipe dope <br /> 4. Flashlight(optk)nal)- ` <br /> open Poppet Closed Poppet <br /> TV5T STEP l: <br /> Remove spfl1 container corer and fill cap from fill adapt- Test figure t <br /> er and tools down into the tube and make sure no debris Pull on exten5iort <br /> or frxeign objects ate present. if debris or fvreigr:ob- socket adaptor <br /> Jetts are present take appropriate steps before proceed- <br /> ing. Look down into the tube and ensure poppet is <br /> completeoly Protected by the defiecticn shi(ld. See Test <br /> Figure 1. If poppet is exposed and tank is not Full the <br /> overfil I valve should be replaced. A flashlight may help <br /> when inspecting O)e tube. <br /> TEST STEP 2: <br /> 1 <br /> Unthread the socket adaptor assembly from the inlet W l <br /> tabe Jsin a 2/4`square°drive extension aqd wtemh. � <br /> The extension will attach to the socket adaptor. Secure r� <br /> all tools to ensure they don't fall into the tank of valve- <br /> ,___ _ <br /> With the extension still attached(pull on the socket <br /> aQa ptor and cable assembly and ensure float and pop- _ - <br /> mt move I fUinction properly. k should only ret vire Y <br /> tD 4"of movement and leas than 5 lbs of force in oder <br /> to actuate the float and poppet. When looking down <br /> into the upper tube ensure poppet is visfbleand moves <br /> into tate flow path{see Test figure 1 &2)when socket Open <br /> E <br /> adaptor n WW aM resets prcxperttr Nri'+rrt socket adap- Poppet Closed <br /> tar is released. If poppet sloes not actuate freely take I 1 Popp", Float moves <br /> appropdate Steps t0 torrent, <br /> i up <br /> MT STEP 3: <br /> Apply pipe dope to the socket adaptor threads. Piper-- <br /> dope"Wd be a non-hardening gasoline resistant pipe <br /> thread leaf oomp�rnd. Make poppet and float <br /> have reset properly and are not visible then install sock- <br /> et adaptor and torque to 35 ft-lbs(42 InAbs)minimu►n <br /> to 5.0 Robs(60 in-lbs)maximum. After installing soduet <br /> adaptor,to ensure vapor tlgh"me OPW recontmeads r <br /> condtKtirtg pressure testing per CARB TP2ot.113. Some Test Pigwv2 <br /> areas may require pr essuw testing of overfih va the per <br /> CARB TP201,1t3 to ensu re va Ive Is vapor tight. If t he <br /> drop Uwe fails pressure testing it may be necessary to <br /> check the seal at the poppet adiaptor threads. Reinstall <br /> A4 cap jr►d cpili,contai"Qr co,rgr affil.+UWjng. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.