Laserfiche WebLink
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />6. TANK SECONDARY CONTAINMENT TEST <br />Test Method Developed by <br />n Manufacturer <br />® Industry Standard E] Professional Engineer <br />Test Type <br />rl Pressure <br />Vacuum <br />17 Hydrostatic <br />Test Equipment Used: 0 to 30" hg Dial Gauge <br />+/- 2% @ Mid Scale <br />Tank ID <br />882-TFUD01 <br />Tank Manufacturer <br />Modern Welding <br />Tank Capacity <br />1,500g <br />Test Start Time <br />9:13a <br />Initial Reading <br />7.00" hg <br />Test End Time <br />10:14a <br />Final Reading <br />7.00" hg <br />Change in Reading <br />0.00" hg <br />Pass/Fail Criteria <br />0.00" hg <br />Tightness Test Results <br />® Pass ® Fail L -L® <br />Pass ®Fail <br />® Pass 17 Fail <br />r] Pass ®Fail <br />7. PIPE SECONDARY CONTAINMENT <br />TEST <br />Test Method Developed by <br />n Manufacturer <br />® Industry Standard Professional Engineer <br />Test Type <br />® Pressure <br />Vacuum <br />® Hydrostatic <br />Test Equipment Used: 0 to 15psi Dial Gauge <br />+/- 2% @ Mid Scale <br />Pipe Run ID <br />882-TFUD01 S/R <br />Pipe Manufacturer <br />Ameron <br />Test Start Time <br />8:58a <br />Initial Reading <br />5.00psi <br />Test End Time <br />10:01a <br />Final Reading <br />5.00psi <br />Change in Reading <br />0.00psi <br />Pass/Fail Criteria <br />0.00psi <br />Tightness Test Results <br />® Pass r] Fail <br />® Pass 0 Fail <br />© Pass ® Fail <br />® Pass ® Fail <br />Pipe Run ID <br />Pipe Manufacturer <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results <br />® Pass ® Fail <br />® Pass ® Fail <br />® Pass ® Fail <br />® Pass ® Fail <br />Additional copies of this page may be attached. <br />All tests marked "Fail' and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 2 of 5 <br />