Laserfiche WebLink
S A N J 0 A Q I I I Irl Environmental Health Department <br /> CCUN r <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> NASHIR WATERLOO INC. 2358 E WATERLOO RD, STOCKTON April 03, 2023 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 208 CCR 2716(a-e) Failure to comply with the designated operator inspection requirements. <br /> OBSERVATION: The designated operator failed to check and note the correct test dates for the monitoring system <br /> certification and overfill prevention on the designated operator inspection reports. The monitoring system <br /> certification test date was listed as 4/7/21 and 4/29/22.The overfill prevention date was listed as 11/22/19.The <br /> correct date for the monitoring system certification is 4/28/22 and the correct date for the overfill prevention is <br /> 10/11/21. <br /> REGULATION GUIDANCE: During the inspection, the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done. <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports. <br /> OBSERVATION: The designated operator inspections for the following months were performed more than 30 days <br /> after the previous inspection: <br /> - Initial inspection on 1/12/23, next inspection performed on 3/8/23 (55 days) <br /> REGULATION GUIDANCE: The designated operator visual inspections shall be conducted within 30 days or less of <br /> the previous inspection. <br /> CORRECTIVE ACTION: Ensure that all designated operator inspections are performed within the required time <br /> frames. <br /> OBSERVATION: Designated operator reports were not signed within the required time frame. <br /> -The 1/12/23 designated operator report was not signed by the owner/operator. <br /> REGULATORY GUIDANCE:Within 48 hours of the completion of the designated UST operator visual inspection, <br /> the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 72 <br /> hours of being provided a signed copy of the report,the owner or operator shall provide a description of each <br /> corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br /> issues. <br /> CORRECTIVE ACTION: Ensure all designated operator inspection reports are completed and signed within the <br /> required time frame in the future. <br /> This is a repeat violation, Class II. <br /> FA0006343 PR0231756 SCO01 04/03/2023 <br /> EHD 23-01 Rev.12/06/2021 Page 6 of 8 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />