My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SNEDEKER
>
809C
>
2800 - Aboveground Petroleum Storage Program
>
PR0528437
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2023 4:47:04 PM
Creation date
4/3/2023 8:30:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0528437
PE
2833
FACILITY_ID
FA0018706
FACILITY_NAME
CANARY RENEWABLES CORP
STREET_NUMBER
809C
STREET_NAME
SNEDEKER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
01
SITE_LOCATION
809C SNEDEKER AVE
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAGE OF <br />34. <br />Two-Position Legs? Yes No Cable-Supported Roof? Yes No Fixed-Roof Inspection Hatches Required? Yes No <br />Internal Roof Drain Required? Yes No Omit Distribution Pads Supporting Uniform Live Loads? Yes No <br />Corrosion Gauge Required? Yes No Fixed Ladder Required? Yes No ; Type of Roof Vent:* <br />Modified Minimum Point Load? Yes No Supplemental Specification <br />Mfr. To Leak Test* % of Compartments in Assembly Yard in Erected Position Unknown; see separate contract terms <br />Roof Erector's Flotation Test: w/ Tank Hydro at Completion of Roof at a Later Date Not Required <br />Flotation Test Media:Water Product (see H.6.6.1)Water Quality:Potable Other See Supplemental Spec. <br />Flotation Test:Duration Fill Height: <br />Flotation Test Items Provided by Purchaser (see H.6.7):None List Attached <br />Responsible Party for Inspecting Roof During Initial Fill: Purchaser Other <br />Approvals:Revisions:Title: <br />By: Ck'd: Date: <br />Drawing No.: Sheet of <br />Additional Data for Internal Floating Roofs: (This section is not applicable to this job) <br />Inlet DiffusersVents <br />Manhole Necks Rolling Ladder <br />Landing Leg Bottom Pads Removable Covers <br />Landing Legs Primary Seal Shoe <br />Shoe MechanismsFoam Log Core <br />Floating Suction Lines <br />Primary Fabric Seal Envelope Fabric <br />Wiper Tip <br />Weather Seal <br />Opening Sleeves Wax Scraper <br />Drain Sumps <br />Inner Rim Plate <br />Gauge Well Secondary Seal Fabric <br />Secondary SealSandwich Panel Core <br />Tubular Pontoon <br />Submerged Pipe <br />Sandwich Panel Face Plate Guide Pole <br />Foam Dam <br />Datum Plate <br />Outer Rim Plate Pontoon Bulkhead <br />Deck Plate <br />C.A./Coating*Material*/Thickness*C.A./Coating*ComponentComponentMaterial*/Thickness* <br />Table 5 FLOATING ROOF MATERIALS <br />I. CASTILLO <br />87 <br />API Std 650 Storage Tank <br />Data Sheet <br />10/28/14
The URL can be used to link to this page
Your browser does not support the video tag.