0 s <br />May 28, 1987 <br />Project 116-1.7 <br />will not be constructed until the final grade over these trenches is <br />established, the July 1 SWAT Report deadline will not be met for leachate <br />sampling and analysis. As soon as construction of the new system is <br />complete, leachate samples will be collected and analysed according to the <br />revised SWAT Proposal, and results will be forwarded to the Regional Water <br />Quality Control Board, Central Valley Region. <br />We will be back at the Forward, Inc. Landfill on June 2 to resume field <br />work. We will close the old monitoring wells, then install the new <br />monitoring wells, and then drill the vadose zone borings. We anticipate <br />well closure will take 3-5 days, well construction will take 2-3 weeks, and <br />vadose zone sampling will take 2-3 weeks. I will call your office <br />periodically to keep you informed of our progress. <br />Please call me at (408) 978-1514 if you have any questions. <br />Respectfully submitted, <br />BETA ASSOCIATES <br />Carrie Cummings <br />CAC:pcf <br />cc: Mr. Greg Basso, Forward, Inc., Stockton <br />Mr. Ray Leclerc, Department of Health Services, TSCD, Sacramento <br />Mr. James Miller, San Joaquin Local Health District, Stockton <br />-3- <br />Associates <br />