My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1984-1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1984-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:12:55 PM
Creation date
4/7/2023 1:44:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1984-1989
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
728
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF C,,,ALIFORNIA ® GEORGE DEUKMEJIAN,Governor <br /> CAS. ORNIA REGIONAL WATER QUALITY CONTROL BOARD— <br /> :. <br /> CENTRAL VALLEY REGION . <br /> 3443 ROUTIER ROAD r <br /> A RAM <br /> S C ENTO,CA 95827-3098 <br /> d <br /> 23 March 1988 <br /> i <br /> Mr. Creq Basso <br /> Forward Inc. <br /> P.O. Box 6336 <br /> I <br /> Stockton, CA 95206 . <br /> CONSTRUCTION REPORT FOR THE ASH PIT AT FORWARD LANDFILL, SAN JOAQUIN COUNTY <br /> (CASE #2209) <br /> Construction of the first coal ash pit in WMU E is nearing completion and it is <br />¢ time to start preparing a construction report as required in Section 2596(a)(1), <br /> Title 23, California Code of Regulations (Subchapter 15). This report will <br /> serve three purposes: (1) document construction, (2) describe quality control <br />{ testing and procedures, and (3) certify that the pit meets the design and <br /> construction requirements of Subchapter 15. Although there is no "official <br /> format" for a construction report and your consultants can prepare the report in <br /> any manner they choose, I feel that if the following construction report outline <br /> I is used, there will be a much higher probability that the report will contain <br /> all the information needed to determine if the pit can be approved as a Class II <br /> I <br /> rani t. <br /> Construction Report Outline <br /> 1. Introduction <br /> 0 <br /> x 2. As-Built Construction Schedule - shows in what sequence and at what time <br /> s each element of the WMU was actually built. <br /> 3. Sidewall and Liner Construction - <br /> a. General description of how built. <br /> i <br /> s <br /> t b. Control Tests - Tests run on materials or equipment prior to placement <br /> to ensure that they comply with specification values. Examples would <br /> be tests run on the clay stockpile before placement, testing of native <br /> materials for leachate compatibility, etc. <br /> C. Record Tests - Tests carried out after placement or installation to <br /> ensure that design specifications are actually met. An example would <br /> i be the numerous permeability tests that were taken during liner <br /> construction, or the surveys taken to establish the liner thickness. <br />
The URL can be used to link to this page
Your browser does not support the video tag.