My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1984-1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1984-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:12:55 PM
Creation date
4/7/2023 1:44:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1984-1989
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
728
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` . . <br /> ~ <br /> ^ <br /> Mr. Greg Basso ' 23 March I988 <br /> d. Permeability Tests - 3DRT, cores* etc. <br /> e, Summary - Contains an analysis of all the control , record and <br /> permeability tests showing that the clay liner and sidewalla were <br /> constructed properly and meet all design specifications {permeability* <br /> liner thickness, leachate computability, etc.). <br /> Results of the control , record, and permeability tests should be presented <br /> in tabular and graphical form. For instance, soil moisture can be <br /> presented as o histogram /number of measurements vs. moisture content). <br /> Statistics should be used where appropriate. <br /> 4. Leachate Collection and Removal System - <br /> a. General description of how built <br /> I, sump construction <br /> 2. LCRS components and placement <br /> b. Control Tests <br /> C. Record Tests - <br /> d. Summary - Show that the LCRS meets all design specifications. <br /> 5. Monitoring System - <br /> a. General description of how built <br /> b. LCRS monitoring <br /> C. Vmdose zone monitoring <br /> d. Ground water monitoring <br /> 6. Variations from the 15 September 1987 Design Plan - Describe and justify <br /> any changes/deviations from the original design plan. <br /> 7. Problems - Describe any problems encountered during construction and their <br /> resolution. An example would be the diesel fuel contaminated LCRS rock. <br /> 8. As-Built Drawings - <br /> a. A complete set of the drawings showing the final contours and <br /> elevations of the WMU. Should also show location and elevation of <br /> major components such as the sump, lJ(simetars, and any temporary <br /> structures, <br /> b. Detail drawing of major and minor components such as the sump, base <br /> LCR3^ sidawull LCRS, lJ/simeters, etc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.