Laserfiche WebLink
U4 Aa adaseA tui" <br /> ForwardInc. Landfill Use Permit Modifications Project Mitigation monitoring program Checklist <br /> Implementation <br /> Mitigation Measure Implementation Monitoring Confirmation Comments <br /> B. SOILS AND GEOLOGY <br /> 132. Revegetation Responsibility. landfill manager. Responsibility: San Joaquin County Community <br /> 'rating: Ulx)n completion of each landfill cell. Development Department. <br /> Taming: Monthly. <br /> 115. Post-earthquake Nater Responsibility: Applicant's hydrogeolog6t shall monitor Responsibility: SjCPI IS shall review earthquake <br /> Inspection Water levels and perform water sampling. Applicant's water inspection report and landfill liner/I.CIIS <br /> landfill engineers anti maintenance crew shall make:dl evaluation and repairs(if necessary). <br /> necessary liner and LCILS repairs. 'liming: After each earthquake. <br /> Tinting: %Vater monitorinWtesting shall be done within 24 <br /> hours of significant earthquakes. Landfill repairs shall be <br /> made prior It)acceptance of further landfill material. <br /> B6. Set I lenient Monitoring Itesi-Amsibifity: or qualified R4.%I-x)nsihiiitv: San Joatlitin( )unty Cotnintinity <br /> landfill engineer shall make settlement determination. IlLvelopment I)epartmentshall review settlement <br /> landfill engineersandmaintenance crew shall make evaluation. <br /> nccounsary landfill infrastructure evaluations and repairs. 'liming: 10--mi-annually and following significant <br /> Timing: On ascmi-annual 1xisis and 161lo%ving significant earthquakes. <br /> earthquake events. <br /> 117. I-rosion monitoring Itesi-AwLsibility: Landfill Manager shall monitor erosion Responsibility: San Joaquin County Community <br /> control measures. Development Department. <br /> liming: Minimum of five years. 'riming: Quarterly. <br /> 118. Landfall Liner Limitation Responsibility: Landfill Manager shall oversee this Responsibility: SJCPHS. <br /> restriction. Tuning: On an ongoing monthly monitoring <br /> 'liming: 'Ibroughout life of project. basis. <br /> C. HYDROLOGY AND WATER QUALITY <br /> (12fill/93(BAS)C201#91,CIILCXLIS) 3 <br />