My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1994-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1994-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2023 2:28:24 PM
Creation date
4/7/2023 2:11:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1994-1999
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
680
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-1111FAIV <br /> W", <br /> LTA As elates.Inc. <br /> ForwardInc. Landfill Use Permit Modifications Project-Mitigation Monitoring Program Checklist <br /> Implementation <br /> Mitigation Measure Implementation Monitoring Confirmation Comments <br /> Cl. Revegetation Responsibility: Landfill maintenance crew. Responsibility: San Joaquin County Community <br /> Timing: Landfill slopes, ridgetops, and peripheral areas Development Department. <br /> shall he revegetated upon landfill cell completion and riming: Ongoing, <br /> intermittently hydroseeded during filling if erosion problem <br /> occurs. <br /> C2. Landidl Cell Design Responsibility: Landfill Environmental Compliance Officer Responsibility: SJCPI IS. <br /> and Design Engineers should design landfill cells and Timing: During review of project plans. <br /> facilities. landfill engineers and qualified construction <br /> contractors should construct facilitiesaccording to design <br /> plans. <br /> Timing: Prior to approval of(Ise Permit and landfill's <br /> acceptance of new materials. <br /> Gi. Additioris to WN111-11 Reslx)nsibility: landfill Solid W;Lstc Coordinator. Responsibility: San.loa(Itain County Public I lealth <br /> Timilig: I lilt il %\'11 11-11 is evaluated and liner designed. Service. <br /> 1-1111ing. 1111til WN111-11 is evaluated and liner <br /> designed. <br /> Ci. \Vc1l Samplings Abandonment Responsibility: Qualified hydrologist or licensed well Responsibility: S)CPllS. <br /> driller contractor. Timing. Quarterly. <br /> Timing: Monthly or more frequently if contamination is <br /> suspected. Abandonment and provision of alternate water <br /> supplies if two testing results show contamination in excess <br /> of MCL[it-nits. <br /> (12111 W)i(1 20 t emelt 1 FC K lJS) 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.