Laserfiche WebLink
-1111FAIV <br /> W", <br /> LTA As elates.Inc. <br /> ForwardInc. Landfill Use Permit Modifications Project-Mitigation Monitoring Program Checklist <br /> Implementation <br /> Mitigation Measure Implementation Monitoring Confirmation Comments <br /> Cl. Revegetation Responsibility: Landfill maintenance crew. Responsibility: San Joaquin County Community <br /> Timing: Landfill slopes, ridgetops, and peripheral areas Development Department. <br /> shall he revegetated upon landfill cell completion and riming: Ongoing, <br /> intermittently hydroseeded during filling if erosion problem <br /> occurs. <br /> C2. Landidl Cell Design Responsibility: Landfill Environmental Compliance Officer Responsibility: SJCPI IS. <br /> and Design Engineers should design landfill cells and Timing: During review of project plans. <br /> facilities. landfill engineers and qualified construction <br /> contractors should construct facilitiesaccording to design <br /> plans. <br /> Timing: Prior to approval of(Ise Permit and landfill's <br /> acceptance of new materials. <br /> Gi. Additioris to WN111-11 Reslx)nsibility: landfill Solid W;Lstc Coordinator. Responsibility: San.loa(Itain County Public I lealth <br /> Timilig: I lilt il %\'11 11-11 is evaluated and liner designed. Service. <br /> 1-1111ing. 1111til WN111-11 is evaluated and liner <br /> designed. <br /> Ci. \Vc1l Samplings Abandonment Responsibility: Qualified hydrologist or licensed well Responsibility: S)CPllS. <br /> driller contractor. Timing. Quarterly. <br /> Timing: Monthly or more frequently if contamination is <br /> suspected. Abandonment and provision of alternate water <br /> supplies if two testing results show contamination in excess <br /> of MCL[it-nits. <br /> (12111 W)i(1 20 t emelt 1 FC K lJS) 4 <br />