Laserfiche WebLink
LSA Auod,0.1.Jam <br /> Forward Inc.Landfill Use Permit Modifications Project-Mitigation Monitoring Program Checklist <br /> Implementation <br /> Mitigation Measure Implementation Monitoring Confirmation Comments <br /> D. AIR QUALITY <br /> D1. Water as Dust Suppressant Responsibility: Landfill operators. Responsibility: San Joaquin Valley Unified Air <br /> Timing. During dust-generating activities throughout life of Pollution Control District. <br /> project. 'riming: Throughout life of project. <br /> D2. Revegetation Responsibility: landfill maintenance. Responsibility: San Joaquin Valley Unified Air <br /> 'riming: When landfill cells are completed or held inactive Pollution Control District. <br /> for long periods of time. Iening: Throughout life of project. <br /> D3. Surfaced Roads Responsibility: Landfill operators. Responsibility: San Joaquin Valley Unified Air <br /> lbroughout life of project. Pollution Control District. <br /> I uning: Throughout life of project. <br /> D4. 15 111ph Speed Limit Resp orisibility- Landfill truck drivers and equipment Responsibility: County Planning Department. <br /> ()I-Wrators. 'riming: Throughout life of project. <br /> Timing: 'Throughout life of project. <br /> Mi. Waste lklivery SclicAluling Resi-xvnsihility: Landfill operator. Resix)nsibility: San Joaquin Valley Unified Air <br /> 'Timing: 111roughout life of project. Pollution Conirol District. <br /> 'ritning. lbroughout life of project. <br /> 1)7. Limit Truck Idling Iteslumsiliflity: Landfill truck drivers. Respt)nsil-sility: -San Joaquin Valley linified Air <br /> 'Timing: 'Throughout life of project. Pollution Control District. <br /> 1-[ming: Throughout life of project. <br /> D8. CA)vcr Contaminated)Soil Responsibility: Landfill operators, Responsibility. San Joaquin Valley Unified Air <br /> 'riming: Daily basis. Pollution Control District. <br /> I iming: Daily. <br /> D9. VOC Collection/Removal Responsibility: Landfill Environmental Compliance Officer, Responsibility: San Joaquin Valley Unified Air <br /> System Design Engineer,and contractors. Pollution Control District. <br /> 'riming: Upon approval of Use Permit and prior to landfill Timing: During project review and throughout <br /> acceptance of new material. life of project on a monthly basis. <br /> 02110193(8ASX201#9\CIIECKt2S) 5 <br />