Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for SINCLAIR NORTH MAIN as of July 13, 2023. <br /> Open violations from May 08, 2023 inspection <br /> Violation#208-Failure to comply with the designated operator inspection requirements. <br /> 1). OBSERVATION:The designated operator failed to check and note all required items on the visual inspection <br /> reports.The incorrect and missing information included the following from the inspection reports: <br /> -The 8/22/22, 9/19/22, 10/17/22, 12/12/22 and 2/6/23 DO reports did not include the owners/operator name <br /> REGULATION GUIDANCE: During the visual inspection,the designated operator shall check that all required <br /> testing and maintenance for the UST system have been completed and shall check all required items on the report. <br /> CORRECTIVE ACTION: Ensure that designated operators performing visual inspections at this facility are including <br /> all of the required information on the reports. <br /> ------------------------------------------------------------------------------------------------------------------------------ <br /> 2). OBSERVATION:The designated operator failed to note the correct test dates for the overfill prevention <br /> equipment test on the designated operator inspection reports. The section for the date was left blank. <br /> REGULATION GUIDANCE: During the inspection, the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done. <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#305-Failed to maintain secondary containment(e.g.failure of secondary containment testing). <br /> OBSERVATION: Loss of brine was found in the UDC 5/6 indicating a leak in the secondary containment. <br /> REGULATION GUIDANCE: Secondary containment shall be impervious to the liquid and vapor of the substance <br /> contained and constructed to prevent structural weakening as a result of contact with any hazardous substances <br /> released from the primary containment. <br /> CORRECTIVE ACTION: Immediately contact a properly licensed,trained, and certified contractor to make repairs <br /> to the UST system under permit and inspection of the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 4 of 5 <br />