My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231765
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 4:07:03 PM
Creation date
4/24/2023 9:27:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231765
PE
2361
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9. COMMENTS <br /> Notes: <br /> 1. UDC #3-4 and #8-9 both failed hydrostatic sump testing. Recommend Bravo B-2000 <br /> retro fit kits for repairs. <br /> 2. T-3 Diesel product line failed 1 hour pressure testing. Recommend helium pin point to <br /> locate leaks for repairs. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.