My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4850
>
2300 - Underground Storage Tank Program
>
PR0548363
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
5/18/2023 8:35:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0548363
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0027616
FACILITY_NAME
G & G INC
STREET_NUMBER
4850
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17948012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4850 S HWY 99 STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J O A Q U I N Environmental Health Department <br /> COUNTY <br /> PRIOR TO FIRST FUEL DELIVERY . <br /> 8 . A valid California Department of Tax and Fee Administration ( CDTFA) number must be obtained and <br /> provided to EHD prior to fuel drop . This number must be uploaded into the California Environmental <br /> Reporting System ( CERS) at https : //cers . calepa . ca , gov , <br /> WITHIN 30 DAYS OF INSTALLING THE UST SYSTEM : <br /> 9 . Submit to CERS all applicable hazardous materials , hazardous waste , and UST elements . The UST <br /> submittal must be approved by EHD prior to scheduling the final inspection . <br /> 10 . The " UST Certification of Installation/ Modification " element in CERS shall be submitted for installed tank <br /> systems , pursuant to CCR 2635 (f) . <br /> PRIOR TO APPROVAL TO OPERATE : <br /> 11 . The following items must be completed prior to receiving approval to operate : <br /> a . An accurate and to-scale as- built diagram or drawing , which indicates the location of the UST <br /> system ( underground storage tanks , piping , auxiliary equipment) with respect to buildings or other <br /> landmarks , per CCR 2711 ( a ) ( 8 ) , must be submitted to EHD . <br /> b . Completed copies of all required installation checklists (tank , etc. ) must be submitted to EHD . <br /> c . The designated operator ( DO ) training requirement must be satisfied , per CCR 2715 (c) . Submit <br /> a copy of the completed Facility Employee Training Certificate . <br /> d . All outstanding operating permit and service request fees must be paid prior to receiving the final <br /> approval to operate . <br /> This permit expires at the end of the calendar year. If an extension to the expiration date is required , a <br /> written request must be submitted to this office prior to the expiration date of December 31 , 2023 . <br /> If you have any questions , please call me at (209 ) 616-3043 or email ust ( sigov . orq . <br /> Thank you , <br /> Stacy Riv <br /> Lead Senior Registered Environmental Health Specialist <br /> Cc: Jivtesh Gill, Paramiyot sandhu(dyahoo. com <br /> 4of4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.