My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4850
>
2300 - Underground Storage Tank Program
>
PR0548363
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:39:15 PM
Creation date
5/18/2023 8:35:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0548363
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0027616
FACILITY_NAME
G & G INC
STREET_NUMBER
4850
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17948012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4850 S STATE ROUTE 99 STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LG 162-2 <br />-5- <br />25290.2(d) include, but are not limited to, riser piping and access points on top of <br />the tank, which provide access to the primary containment of the tank and may <br />be in contact with vapors of the stored product. <br />10. For USTs installed on or after July 1, 2003 and prior to July 1, 2004, is an <br />annual line tightness test on pressurized piping required? <br />Yes. As for all USTs installed since January 1, 1984, the requirement for <br />"underground pressurized piping ... (to) be tightness tested annually" also applies <br />to USTs installed on or after July 1, 2003 and prior to July 1, 2004. [H&S Code, <br />§25290.2(g); H&S Code, §25291(f).] The annual line tightness testing requirement <br />may be met by satisfying the criteria specified in CCR, Title 23, Section 2636(g)(1- <br />5). <br />PART II: USTs INSTALLED ON OR AFTER JULY 1, 2004. <br />In addition to the requirements discussed below (Questions A -D of Part II), USTs <br />installed on or after July 1, 2004 are subject to all of the installation and monitoring <br />requirements presented in the responses to Questions 1-8 of Part I. For USTs installed <br />on or after July 1, 2004, references to the "July 1, 2003" date in Part I should be <br />substituted with "July 1, 2004." The H&S Code citations relevant to USTs installed on or <br />after July 1, 2003 and July 1, 2004 are provided in the table below. Note that Questions <br />9 and 10 of Part I do not apply to USTs installed on or after July 1, 2004. <br />Question <br />Number <br />H&S Code Citation for USTs <br />Installed On or After July 1, 2003 and <br />Prior to July 1, 2004 <br />Part I <br />H&S Code Citation <br />for USTs Installed <br />On or After July 1, 2004 <br />Part II <br />1 <br />H&S Code §25290.2(a) <br />H&S Code §25290.1 a <br />2 <br />3 <br />H&S Code §25290.2(c)(3) <br />H&S Code 25290.1 (c)(3) <br />4 <br />H&S Code §25290.20) <br />H&S Code §25290.1(k) <br />5 <br />H&S Code §25290.20) <br />H&S Code 25290.1 k <br />6 <br />H&S Code §25290.2(i) <br />H&S Code §25290.10) <br />7 <br />H&S Code 25290.2 <br />H&S Code 25290.1 <br />8 <br />H&S Code §25290.2 <br />H&S Code §25290.1 <br />A. In accordance with H&S Code, Section 25290.1(e), which components of <br />USTs installed on or after July 1, 2004 must be continuously monitored <br />using vacuum, pressure, or interstitial liquid level measurement methods? <br />The interstitial space of the tank and product piping (including fill, vent, and vapor <br />recovery piping), that are beneath the surface of the ground must be maintained <br />under constant vacuum or pressure. Statute also requires that a breach in the <br />primary or secondary containment be detected before the liquid or vapor of the <br />stored substance is released to the environment. Continuous vacuum, pressure, <br />or interstitial liquid level measurement methods can be used to satisfy these <br />California Environmental Protection Agency <br />Zai Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.