My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4850
>
2300 - Underground Storage Tank Program
>
PR0548363
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:39:15 PM
Creation date
5/18/2023 8:35:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0548363
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0027616
FACILITY_NAME
G & G INC
STREET_NUMBER
4850
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17948012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4850 S STATE ROUTE 99 STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LG 162-2 <br />-7- <br />satisfy the monitoring requirement in Section 25290.1(d). These components <br />include, but are not limited to, riser piping and access points on top of the tank, <br />which provide access to the primary containment of the tank and may be in <br />contact with vapors of the stored product. <br />The requirement for sumps and UDCs to have sensors is as follows. Sumps and <br />UDCs installed and monitored in accordance with paragraph A.i, above, must <br />have sensors that are capable of detecting liquid and vapor releases from the <br />primary containment. No sensors are required for sumps and UDCs installed <br />and monitored in accordance with paragraph A.ii, above. Sumps and UDCs <br />installed and monitored in accordance with paragraph A.iii, above, are only <br />required to have sensors that are capable of detecting liquid releases. <br />C. For UST components monitored continuously using vacuum, pressure, or <br />interstitial liquid level measurement methods, is additional testing or <br />evaluation necessary? <br />If the component's current listing includes approval for its use with continuous <br />monitoring using vacuum, pressure, or interstitial liquid level measurement <br />methods, no further testing or evaluation is necessary. However, if the <br />component's current listing does not include approval of its use with continuous <br />monitoring using vacuum, pressure, or interstitial liquid level measurements, <br />additional testing or evaluation may be necessary. Owners and operators should <br />ensure that UST components are approved for use with a continuous monitoring <br />system using pressure, vacuum, or interstitial liquid level measurement methods <br />consistent with the requirements outlined in Sections 2631 (b) and (d), Title 23, <br />CCR, as applicable. <br />D. For USTs installed on or after July 1, 2004, is the annual line tightness test <br />on pressurized piping required? <br />No. For USTs installed on or after July 1, 2004, an annual line tightness test on <br />the primary piping is not required. <br />If you have questions regarding this document, please contact the UST Program at <br />(916) 341-5775 or via e-mail at.ustCcD-waterboards.ca.gov. <br />Sincerely, <br />Original signed by <br />Kevin Graves, P.E., Manager <br />Underground Storage Tank Program <br />California Environmental Protection Agency <br />Zai Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.