My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2024 9:47:35 AM
Creation date
5/19/2023 10:52:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231310
PE
2361 - UST FACILITY
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
351 N BECKMAN RD LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer © Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure © Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Vacuum Pump/Vacuum Gauge in Hg. <br /> Tank ID 5-Clr Diesel <br /> Tank Manufacturer K&T Steel <br /> Tank Capacity 10K <br /> Test Start Time 9:40 <br /> Initial Reading -6" Hg. <br /> Test End Time 10:40 <br /> Final Reading -6" Hg. <br /> Change in Reading 0" Hg. <br /> Pass/Fail Criteria No Loss <br /> Tightness Test Results ® Pass ❑ Fail I ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br /> Pipe Run ID 9-Clr D Vent 10-Cir D T-5 11-Cir D AB 12CIr D Vent <br /> Pipe Manufacturer Smith Smith Smith Smith <br /> Test Start Time 9:35 9:40 9:45 9:50 <br /> Initial Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time 10:35 10:40 10:45 10:50 <br /> Final Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Change in Reading 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Criteria No Loss No Loss No Loss No Loss <br /> Tightness Test Results © Pass ❑ Fail © Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.