My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2024 9:47:35 AM
Creation date
5/19/2023 10:52:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231310
PE
2361 - UST FACILITY
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
351 N BECKMAN RD LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID 1-Red D-PS 2-91-PS 3-87-PS 4-Clr D-PS <br /> Sump Manufacturer Western FG Western FG Western FG Western FG <br /> Sump Depth (inches) 39" 42" 41" 43" <br /> Sump Bottom to Top of 20" 18" 18" 18" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11:07 11:12 11:17 11:22 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 11:37 11:42 11:47 11:52 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Lss/FailCriteria > .002 > .002 > .002 > .002 <br /> htness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID 5-Clr D-PS UDC 1&2 UDC 3&4 UDC 5&6 <br /> Sump Manufacturer Western FG APT APT APT <br /> Sump Depth (inches) 30" 29" 29" 29" <br /> Sump Bottom to Top of 15" 15" 15" 14" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11:27 10:12 10:17 10:22 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 11:57 10:42 10:47 10:52 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 > .002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.