Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Farm <br /> B. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by U Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure R) Vacuum ❑ Hydrostatic <br /> Test Equipment Used: gauge <br /> Tank ID Regular(RUL) Premium(PUL) <br /> Tank Manufacturer unknown unknown <br /> Tank Capacity 10000 10000 <br /> Test Staff Time 8:48 8:48 <br /> Initial Reading 10hg 10hg <br /> Test End Time 9:48 9:48 <br /> Final Reading 10hg 10hg <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria 0 0 <br /> Tightness Test Results ® Pass ❑ Faaf 0 Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> PassfFail Criteria <br /> Tightness Test Results ❑ Pass a Fail ❑ Pass ❑ Fail ❑ Pass D Fail D Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional codes of this page may be attached. <br /> All tests marked '`Fail'acrd any repairs made before or during the tighMess test must,fie described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />