Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Farm <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by U Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Tank ID <br /> Tank Manufacturer <br /> Tank Capacity <br /> Test Staff Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Faaf ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> Test Type 0 Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: gauge <br /> Pipe Ru n I D TRegular L1(RUL)STP TPremium L1(PUL)STP <br /> Containment 1 to 1/2,3/4 Containment 1 to 1/2,3/4 <br /> Pipe Manufacturer environ environ <br /> Test Start Time 8:36 8:36 <br /> Initial Reading 5psi 5psi <br /> Test End Time 9:36 9:36 <br /> Final Reading 5psi 5psi <br /> Change in Reading 0 0 <br /> PassfFail Criteria 0 0 <br /> Tightness Test Results 0 Pass a Fail 0 Pass ❑ Fail ❑ Pass D Fail D Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional codes of this page may be attached. <br /> All tests marked '`Fail'and any repairs made before or during the tighMess test must,fie described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />